Laserfiche WebLink
ST 20: OBTAIN A DISCHARGE PERMIT FOR WATER PUMPED FROM THE DEWATERING <br />WELLS AND SUBMIT A MINOR REVISION. <br />A DISCHARGE PERMIT FOR WATER PUMPED FROM THE DEWATERING WELLS MUST <br />BE INPLACE, AND A MINOR REVISION TO THE PERMIT SUBMITTED AND APPROVED <br />BY THE DIVISION TO UPDATE SECTION 2.03. 10 OF VOL UME I OF THE PERMIT <br />APPLICATION PACKAGE, BEFORE ANY PUMPING FROM WELLS ASSOCIATED WITH <br />THE COLLOMPITISALLOWED TO OCCUR. <br />ST 23: OBTAINA DISCHARGE PERMIT FOR STORMWATER RUNOFF AND SUBMIT A <br />MINOR REVISION. <br />A DISCHARGE PERMIT FOR STORMWATER RUNOFF MUST BE INPLACE, AND A MINOR <br />REVISION TO THE PERMIT SUBMITTED AND APPROVED BY THE DIVISION TO UPDATE <br />SECTION 2.03. 10 OF VOLUME I OF THE PERMIT APPLICATION PACKAGE, BEFORE ANY <br />DISTURBANCE ASSOCIATED WITH THE COLLOM PIT ISALLOWED TO OCCUR. <br />CCC responded that there is no rule requirement for well permits or discharge permits to be <br />included in the PAP, and proposed reworded text for the three stipulations. <br />Rule 2.03.10, Identification of Other Licenses and Permits, reads as follows: <br />Each application shall contain a list of all other licenses and permits needed by the applicant to <br />conduct the proposed surface or underground mining activities. <br />This list shall identify each license and permit by: <br />(1) Type ofpermit or license; <br />(2) Name and address of issuing authority; <br />(3) Identification numbers of applications for those permits or licenses, or, if issued, the <br />identification numbers of the permits or licenses; and <br />(4) If a decision has been made, the dale of approval or disapproval by each issuing authority. <br />The text of the stipulations proposed in the January 8, 2018, letter (which is shown above) does <br />not require that the well permit(s) and discharge permit(s) be added to the PAP in their entirety, <br />but that Section 2.03. 10 be updated. <br />There is no reason to change the language of stipulations 19 and 20. <br />Response: Tri-State concurs with the Division, and will submit the well and discharge permits <br />once obtained under a minor revision to update Section 2.03. 10 to satisfy Stipulations 19 and 20, <br />I have not been able to find a copy of CCUs construction stormwater permit in the Division's <br />records, and no reference is made to it in section 2.03. 10 of the PAP. <br />Please provide a copy of #COR03L802 for review, and update section 2.03.10 of the PAP. <br />Response: A copy of Permit #COR03000, Certification No. COR03L802 has been provide for <br />the Division. It should be noted that this is a copy only and it is not intended to become part of <br />the PAP. Further, as requested the list of permits in Section 2.03.10 has been updated with this <br />permit. <br />Stipulation 23 should retain a reference to section 2.03.10. The proposed text is as follows: <br />ST 23: OBTAIN ANINDIVIDUAL DISCHARGE PERMIT AND SUBMIT A MINOR REVISION. <br />ANINDIVID UAL DISCHARGE PERMIT MUST BE INPLACE, AND A MINOR REVISION TO <br />THE PERMIT SUBMITTED AND APPROVED BY THE DIVISION TO UPDATE SECTION <br />AN EQUAL OPPORMNRY/AFFIRMATIVE ACTION EMPLOYER <br />A Touchstone Energy'Cooperative t <br />