Laserfiche WebLink
PART II <br />Permit - Page 24 <br />Permit No, COR -030000 <br />11. CHANGES IN THIS GENERAL PERMIT (cont.) <br />B, Atithorily ►rr Dis me -Oil cord Ga.y Consiniction <br />This section has been added, to take into account a regulatory change. The federal Energy Policy Act of <br />2005 exempts nearly all oil and gas construction activities fi-otn federal requirements under the Clean Water <br />Act's NPDES stormwater discharge permit program. In January 2006, the Colorado Water Quality Control <br />Commission held a hearing to determine what effects, if any, the change in federal law would have upon <br />Colorado's stormwater regulations. The Commission determined that oil and gas construction sites in <br />Colorado that disturb one or more acres are still required to be covered under Colorado's stormwater <br />permitting regulations (Colorado Discharge Permit System (CDPS) regulations (SCCR 1002-61)). In <br />practice, oil and gas construction sites have the satire requirements under this permit as do other types of <br />construction. However, this permit contains some references to the federal Clean Water Act; generally these <br />references are not applicable to oil and gas construction sites to the extent that the references are limited by <br />the federal EnergyPolicy Act of 2005, See Part LA, l (b) of the permit. <br />C. Allilic flon Regtt_ir n tv <br />The permit application requirements have changed slightly, including the addition of an email address, if <br />available. See Part LA.4(b). <br />The applicant must be either the owner and/or operator of the construction site. An operator at a <br />construction site that is not covered by a certification held by an appropriate entity may be held liablefrrr <br />operating without the necessary permit coverage. <br />D. Terri Mi_ary Coive <br />Part LA,S(d) of the previous permit (effective July 1, 2002) dealt with temporarily covering a facility under <br />the general permit even if an individual permit is more appropriate. This permit section essentially <br />duplicated the previous section (see Part LA. 5(c)), and so it has been deleted. <br />E. Reassi =nates u 'Per snit Cavei ct e <br />Procedures have been added to clam the requirements for the transfer of coverage ofs re(i to ror 'cans of a <br />permitted site to a second parry. See Section VII1.1.3 of the rationale and Part LA.8 of'the permit. <br />F. Individual Permit Criteria <br />This section has been modified to include situations involving a Total Maximum Daily Load (TMDL). See <br />Part LA. I 1 of the permit. <br />G. Storanvater lticniaeerrte►t Plan (SWMP) <br />The Stormwater Management Plan section has been divided into two parts: Stormwater Management Plan <br />(SWMP) - General Requirements, which provides the basic framework and general requirements for the <br />SWAP, and Stormwater Management Plan (SWMP) - Contents, which specifically identifies each item that <br />must be addressed in the SWMP. See Parts LB and LC of the permit. <br />H. Sl{lrl► water Management Plan (SWUP) - enera Req�rir entertts <br />The SWMP General Requirements section has been modified to require that the SWMP be updated in <br />accordance with Parts LD.S(c) and LD.S(d) of the permit (SWMP Review/Changes). This additional <br />requirement ensures that the SWMP provisions reflect current site conditions. See Part 1B.2(c) of the <br />permit. <br />