Laserfiche WebLink
January 24, 2018 C-1981-022/Elk Creek Mine LDS <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 3 of 7 <br /> <br />channel. A light snowfall before the inspection and subsequent warm temperatures meant that a trickle of water <br />was audible, and the ground was soft, but there was no significant flow in the channel and impacts to the stream <br />were negligible. <br />Below the site of the crushing and screening facility a drop inlet had accumulated some material, but it <br />was not close to being blocked and may be cleaned out as part of the routine site maintenance program, <br /> <br /> <br />DOCUMENTS RECEIVED <br />N/A <br />OTHER (SPECIFY) <br />N/A <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />