Laserfiche WebLink
f. Each successive phase of this amendment may require a gond adjustment by <br />DRMS, just as each successive (future) technical revision could change the <br />bond amount. <br />b. Supplemental Materials and On-going, Reporting <br />a. DBMS will receive annual reports of the reclamation and monitoring: required <br />"Annual reports and maps" summarizing information; discuss with DRMS <br />whether "annual Geotechnical reports" and maps can be discontinued. <br />7. Conclusions <br />a. DRMS has required HMC to develop an updated reclamation plan, in the form <br />of a permit amendment. This amendment is appropriate and necessary to <br />carry out the final reclamation and closure of the Pitch Project site. <br />b. Since not all standards or aspects of the overall reclamation can be identified <br />or defined at the present time, it is not possible for this amendment to address <br />all of the tasks which may be needed and carried out. <br />c. HMC and DRMS both recognize and agree that more content is still needed in <br />the amendment. HMC is including all possible known reclamation areas in <br />this current reclamation plan amendment. HMC commits to develop and <br />present additional reclamation plans via technical revisions of the reclamation <br />plan. In this manner HMC will be able to comply with the current <br />requirement imposed by DRMS and accomplish the longer-term need for fully <br />defining the remaining reclamation needs, and implementing them. <br />(end of Pitch pre -amendment outline) <br />