My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-31_REPORT - C1981018 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981018
>
2018-01-31_REPORT - C1981018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 9:50:03 AM
Creation date
2/1/2018 8:23:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Report
Doc Date
1/31/2018
Doc Name
Annual Hydrology Report
From
Blue Mountain Energy
To
DRMS
Annual Report Year
2016
Permit Index Doc Type
Hydrology Report
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> <br />simplicity. The Deserado Mine coal seams are located near the bottom of the Coal and <br />Siltstone Facies (middle zone). Water levels were measured in the groundwater monitoring <br />piezometers according to the schedule in Appendix A. The water level is measured <br />quarterly in Qal-5, and samples collected annually to analyze for the water quality <br />parameters listed in Table 2-1. <br /> <br />As a part of the mid-term review technical revision (TR48), DRMS approved discontinuing <br />the monitoring of the following wells: <br /> <br /> TW2-7U, TW2-7L <br /> 2-7U, 2-7M, 2-7L <br /> 35-4U, 35-4L <br /> RM-1 <br /> 35-4M <br /> 36-2U, 36-2L <br /> <br />Minor Revision 149 (2012) approved the plugging of the lower and middle zone monitoring <br />wells following the last required sampling to address safety issues with having an open <br />conduit between the mined out areas and the surface. 32-7M and 32-7L have been <br />permanently plugged to address this issue. 29-4M was plugged in November 2012 <br />following its final required sampling. <br /> <br />BME also requested that the monitoring frequencies be reduced to annual for all bedrock <br />wells and quarterly for alluvial well Qal-5 and the water sampling requirement changed to <br />annual for Qal-5. DRMS approved BME’s application on November 10, 1998. These <br />changes took effect for the 1998-1999 water year. <br /> <br />During October 1984, the Taylor Draw Reservoir facilities were completed and the reservoir <br />began filling with water. The area around the alluvial groundwater holes became a shallow <br />water mud flat area with the deposition of mud, silt and sand at high reservoir levels. As a <br />result, alluvial groundwater monitoring holes Qal-1, Qal-2, Qal-3, Qal-4 and Qal-6 have <br />been destroyed and are no longer available for monitoring. Alluvial well Qal-5 is still being <br />monitored. <br /> <br />During May 1987, longwall panel 1 was mined past the location of 2-12U. The location was <br />subsided and the monitoring hole could no longer provide usable data. Accordingly, <br />Western Fuels, Utah (now BME) applied for a Technical Revision on 6/7/88 to eliminate <br />groundwater monitoring at 2-12U. The Technical Revision was subsequently approved. <br /> <br />Per the DRMS permit requirements, water from the groundwater monitoring holes 29-4M, <br />30-8M, 31-7M, 32-7M, and 33-8M in Leases C-8424 and C-8425 were sampled and
The URL can be used to link to this page
Your browser does not support the video tag.