Laserfiche WebLink
Date: 1/16/2018 County: Moffat <br />User: ZTT <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat DI IT - 11 U <br />Horsepower: 850 <br />Blade Type: Universal <br />Attachment: 1 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />113 "A♦ <br />Filename: C019-004 <br />$226.13 <br />Utilization % <br />NA <br />$183.90 <br />100 <br />$21.79 <br />NA <br />$11.30 <br />100 <br />$41.85 <br />NA <br />$484.97 <br />$1,939.86 <br />MATERIAL QUANTITIES <br />Initial Volume: 78,000 <br />Swell factor: 1.000 <br />Loose volume: 78,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />320 feet <br />998.5 LCY/hr <br />Partly consolidated stockpile 1.1 <br />-10% <br />7,600 feet <br />2.572 lbs/LCY <br />Weight description: User Provided <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Source <br />0.900 <br />(AB.AVG.) <br />1.100 <br />(CAT HB) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ-OC) <br />1.225 <br />(CAT HB) <br />