Laserfiche WebLink
Job efficiency: 0.830 <br />Spoil pile: 1.000 <br />Push gradient: 1.115 <br />Altitude: 0.930 <br />Material Weight: 0.894 <br />Blade type: 1.000 <br />Net correction: 0.7617 <br />Adjusted unit 517.96 LCY/hr <br />production: <br />Adjusted fleet 2071.84 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.936/LCY <br />Total job time: 38.13 Hours <br />Total job cost: $73,968 <br />(1 SHIFT/DAY) <br />(DOZ-OC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />BULLDOZER WORK <br />Task description: Doze Poly ID D-17 (Map 35A) <br />Site: Colowyo Coal Mine Permit Action: RN7 <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />