Laserfiche WebLink
467 <br />468 <br />469 <br />470 <br />471 <br />472 <br />473 <br />Reseed Geotechnical Hole Access Corridors <br />(MR154) <br />REVEGE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2.40 <br />$1,440.00 <br />$98.00 <br />$600.00 <br />$30,448.97 <br />$2,292.00 <br />$1,010.00 <br />$6,720.00 <br />Regrade ditch CWD-5 (TRI 14) <br />DOZER <br />0.51 <br />Reseed CWD-5 Dtich (TR114) <br />REVEGE <br />1.00 <br />Plug and Seal 33 Collom In -Pit Drill Holes <br />(MR174) <br />BOREHOLE <br />194.00 <br />Regrade Topsoil for Collom In -Pit Drill Pads <br />(MR174) <br />DOZER <br />4.73 <br />Regrade Topsoil for Collom In -Pit Drill Roads <br />(MR174) <br />DOZER <br />2.08 <br />Reseed Collom In -Pit Drill Pads and Roads <br />(MR174) <br />REVEGE <br />11.20 <br />SUBTOTALS: <br />67057.07 <br />$258,206,786 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02 <br />Performance bond: <br />1.05 <br />Job superintendent: <br />17,140.96 <br />Profit: <br />10.00 <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O&P= <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />500.00 <br />2.00 <br />1.91 <br />CONTINGENCY: 0.00 <br />$5,215,777.08 <br />$2,711,171.25 <br />$1,252,147.13 <br />$25,820,678.60 <br />$34,999,774.06 <br />$293,206,560.06 <br />Total = 500.00 <br />Total = $5,864,131.20 <br />$5,600,245.30 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $46,464,650.56 <br />TOTAL BOND AMOUNT (direct + indirect) = $304,671,436.56 <br />