My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-24_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-01-24_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2018 10:35:13 AM
Creation date
1/24/2018 9:45:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
1/24/2018
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
RN7
Email Name
ZTT
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
778
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
467 <br />468 <br />469 <br />470 <br />471 <br />472 <br />473 <br />Reseed Geotechnical Hole Access Corridors <br />(MR154) <br />REVEGE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2.40 <br />$1,440.00 <br />$98.00 <br />$600.00 <br />$30,448.97 <br />$2,292.00 <br />$1,010.00 <br />$6,720.00 <br />Regrade ditch CWD-5 (TRI 14) <br />DOZER <br />0.51 <br />Reseed CWD-5 Dtich (TR114) <br />REVEGE <br />1.00 <br />Plug and Seal 33 Collom In -Pit Drill Holes <br />(MR174) <br />BOREHOLE <br />194.00 <br />Regrade Topsoil for Collom In -Pit Drill Pads <br />(MR174) <br />DOZER <br />4.73 <br />Regrade Topsoil for Collom In -Pit Drill Roads <br />(MR174) <br />DOZER <br />2.08 <br />Reseed Collom In -Pit Drill Pads and Roads <br />(MR174) <br />REVEGE <br />11.20 <br />SUBTOTALS: <br />67057.07 <br />$258,206,786 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02 <br />Performance bond: <br />1.05 <br />Job superintendent: <br />17,140.96 <br />Profit: <br />10.00 <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O&P= <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />500.00 <br />2.00 <br />1.91 <br />CONTINGENCY: 0.00 <br />$5,215,777.08 <br />$2,711,171.25 <br />$1,252,147.13 <br />$25,820,678.60 <br />$34,999,774.06 <br />$293,206,560.06 <br />Total = 500.00 <br />Total = $5,864,131.20 <br />$5,600,245.30 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $46,464,650.56 <br />TOTAL BOND AMOUNT (direct + indirect) = $304,671,436.56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.