My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-24_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-01-24_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2018 10:35:13 AM
Creation date
1/24/2018 9:45:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
1/24/2018
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
RN7
Email Name
ZTT
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
778
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
415 <br />416 <br />417 <br />418 <br />419 <br />420 <br />421 <br />422 <br />423 <br />424 <br />425 <br />426 <br />427 <br />428 <br />429 <br />430 <br />431 <br />432 <br />433 <br />434 <br />435 <br />436 <br />437 <br />438 <br />439 <br />440 <br />441 <br />442 <br />443 <br />444 <br />445 <br />446 <br />447 <br />448 <br />449 <br />450 <br />451 <br />452 <br />453 <br />454 <br />456 <br />457 <br />458 <br />459 <br />460 <br />461 <br />462 <br />463 <br />464 <br />465 <br />466 <br />Demolish facilities at Collom (TR108) <br />DEMOLISH <br />1 <br />2 <br />4 <br />4 <br />4 <br />4 <br />4 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />3 <br />1 <br />60.00 <br />Rip 29,458' of Collom Haul Road (TR108) <br />RIPPER <br />12.69 <br />Haul Spoil to Collom Haul Road <br />SCRAPER1 <br />569.57 <br />Regrade Collom Haul Road TR108 <br />DOZER <br />414.90 <br />Regrade Topsoil for Collom Haul Road (TR 108) <br />DOZER <br />49.14 <br />Regrade Collom Facility Area (TR108) <br />DOZER <br />437.31 <br />Regrade Topsoil at Collom Facility Area (TRI 08) <br />DOZER <br />88.15 <br />Rough Grade Collom Disturbance <br />GRADER <br />172.10 <br />Section 25 Pond Removal <br />DOZER <br />30.18 <br />Middle Pond Removal <br />DOZER <br />11.25 <br />Section 36 Pond Removal <br />DOZER <br />18.11 <br />Section 26 Pond Removal <br />DOZER <br />27.52 <br />Sidehill Pond Removal <br />DOZER <br />52.38 <br />Coal Stockpile Pond Removal <br />DOZER <br />144.16 <br />Temporary Facilities Pond Removal <br />DOZER <br />10.67 <br />Wilson Storage Pond Removal <br />DOZER <br />35.67 <br />Regrade ditch D1 Upper 00-57+74 <br />DOZER <br />15.23 <br />Regrade ditch D1 Lower (00-6+23) <br />DOZER <br />1.46 <br />Regrade ditch D2 <br />DOZER <br />4.56 <br />Regrade ditch D3 <br />DOZER <br />5.85 <br />Regrade ditch D4 <br />DOZER <br />4.18 <br />Regrade ditch D5 <br />DOZER <br />2.65 <br />Regrade ditch D6 <br />DOZER <br />0.71 <br />Regrade ditch D7 <br />DOZER <br />2.38 <br />Regrade ditch D8 <br />DOZER <br />0.32 <br />Regrade ditch D9 <br />DOZER <br />0.49 <br />Regrade ditch D10 <br />DOZER <br />3.35 <br />Regrade ditch D 11 a <br />DOZER <br />1.17 <br />Regrade ditch Dl lb <br />DOZER <br />0.47 <br />Regrade ditch D12 <br />DOZER <br />0.75 <br />Regrade ditch UCW <br />DOZER <br />2.13 <br />Regrade ditch LCW <br />DOZER <br />3.93 <br />Regrade ditch LCW <br />DOZER <br />0.31 <br />Regrade Topsoil for Collom Ditches <br />DOZER <br />10.44 <br />Regrade Topsoil for Raw Water Line <br />DOZER <br />14.02 <br />Regrade Topsoil for Taylor Creek Pipe Crossing <br />DOZER <br />1.54 <br />Remove and dispose of Rip rap from ditches, D1, <br />D2, D3, D4 <br />TRUCKI <br />5.76 <br />Collom-Haul topsoil from 25A to Sump area <br />SCRAPER1 <br />10.17 <br />Haul topsoil from 25A to UCWD <br />SCRAPERI <br />0.83 <br />Coal Stockpile Pond Removal <br />DOZER <br />144.16 <br />Seed & Reseed Disturbance Shrub/Grass mix <br />REVEGE <br />290.45 <br />Seed & Reseed Disturbance Sagebrush/Steppe mix <br />REVEGE <br />1,163.30 <br />Reseed Haul Road and Associated Dist (See Exh. <br />13C) <br />REVEGE <br />133.00 <br />Collom-Weed control in Sb/Steppe mix 10% of <br />1161.46 ac. 3X <br />REVEGE <br />120.00 <br />Collom-Post Mining Channels <br />NA <br />12,287.17 <br />Sealing monitoring wells (MR161) <br />BOREHOLE <br />53.00 <br />Mobilize/demobilize equipment from Craig <br />MOBILIZE <br />6.44 <br />Collom-Weed control in GL recl 10% of 290.45 <br />ac. 3X <br />REVEGE <br />48.00 <br />Haul topsoil from 25A to LCWD <br />SCRAPER1 <br />10.29 <br />Haul Spoil from Temp spoil pile to Collom Lite <br />(2017 W -C) <br />TRUCKI <br />16,052.91 <br />Plug and Seal 16 Geotechnical Boreholes (MR 154) <br />BOREHOLE <br />24.00 <br />$1,421,627.90 <br />$13,478.00 <br />$1,645,063.00 <br />$786,095.00 <br />$93,110.00 <br />$828,558.00 <br />$167,021.00 <br />$54,822.00 <br />$6,930.00 <br />$2,584.00 <br />$4,158.00 <br />$6,319.00 <br />$12,031.00 <br />$33,109.00 <br />$2,451.00 <br />$8,192.00 <br />$2,921.00 <br />$279.00 <br />$875.00 <br />$1,005.00 <br />$719.00 <br />$455.00 <br />$136.00 <br />$457.00 <br />$62.00 <br />$94.00 <br />$643.00 <br />$224.00 <br />$90.00 <br />$144.00 <br />$409.00 <br />$753.00 <br />$59.00 <br />$1,796.00 <br />$6,641.00 <br />$748.00 <br />$3,044.00 <br />$8,478.00 <br />$695.00 <br />$33,109.00 <br />$240,052.00 <br />$921,766.00 <br />$77,478.00 <br />$40,932.00 <br />$3,269,085.00 <br />$152,388.54 <br />$119,253.00 <br />$10,251.00 <br />$8,576.00 <br />$179,763,507.00 <br />$1,967.67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.