My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-23_GENERAL DOCUMENTS - C1981041
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981041
>
2018-01-23_GENERAL DOCUMENTS - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2018 1:45:42 PM
Creation date
1/23/2018 1:44:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
1/23/2018
Doc Name Note
For RN7
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Snowcap Coal Company, Inc
Permit Index Doc Type
Findings
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> 8 C1981-041 RN7 findings <br /> <br />Permit Revisions <br /> <br />PR-6: Approved November 18, 2016. Changed the post mining land use at the North Portal Area <br />to commercial and Industrial. The Town of Palisade in conjunction with the Colorado Division <br />of Parks and Wildlife plan to construct a state of the art shooting and training complex on the <br />site. <br /> <br />Surety Releases <br /> <br />SL-10: Approved July 24, 2017. SL-10 approved final Phase III bond release on 4.0 acres <br />located at the Roadside North Portal area. These areas have received approved for an industrial <br />post-mining land use. The Town of Palisade and Colorado Parks and Wildlife are developing <br />these areas into a shooting facility. The Division approved release of $14,089.16. <br /> <br />SL-9: Partially Approved November 23, 2016. SL-9 approved Phase II liability on 13.1 acres <br />and from Phase III liability on 9.6 acres. Also, the proposed decision will terminate Division <br />jurisdiction on 0.2 acres of undisturbed land overlying underground workings. The Division <br />released $97,202.20 of financial liability. <br /> <br />SL-8: Partially Approved October 8, 2015. SL-8 approved Phase I, II, and III bond release on <br />both disturbed and undisturbed acres located within the permit boundary at the Roadside North <br />and South Portals Mine. Portions of these areas have been disturbed by mining facilities or <br />structures or have been undermined. The Division approved; Phase I bond release on 22.2 <br />disturbed acres, and 766.2 affected acres, Phase II bond release on 136.5 disturbed acres, and <br />880.5 affected acres, Phase III bond release on 128 disturbed acres, and 872.0 affected acres. <br />SL8 approved release of $663,429.00. Reduction of the bond amount was conditioned upon <br />submittal of a revision/or revisions to address suspected hydrologic communication in Tract #71. <br />This condition was addressed with submittal and approval of MR-82 and TR-69. <br /> <br />Status of Stipulations <br /> <br />The stipulation history for the Roadside Portals was reviewed with this renewal application. The <br />review included an investigation of any stipulations imposed, and any responses to existing <br />stipulations received since the last midterm review. All previously issued stipulation have been <br />complied with, or terminated, and there are no active stipulations attached to this permit. Any <br />stipulations associated with this permit and issued over the life of this operation which are not <br />discussed in this renewal application have been complied with or terminated. <br /> <br />Enforcement Actions <br />No enforcement actions were issued since the last midterm review of the Roadside Portals permit <br />application package. <br />
The URL can be used to link to this page
Your browser does not support the video tag.