My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-02_PERMIT FILE - C1980004A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980004
>
2018-01-02_PERMIT FILE - C1980004A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2018 11:39:42 AM
Creation date
1/22/2018 10:50:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004A
IBM Index Class Name
Permit File
Doc Date
1/2/2018
Section_Exhibit Name
Section 2.05 & 2.06
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.3 <br />3. Topsoil stockpile and Sediment pond <br />4. Construction material stockpile and Coal Mine Waste Pile <br />(3) Mine Facilities <br />The major surface facilities are all located east of East Salt Creek. The <br />Cameo Seam mine portals are located about 3,300 feet east of State <br />Highway 139 at an elevation of approximately 5610 feet where the Seam <br />outcrops. <br />(3)(a) Following is a discussion of the proposed mine facilities: <br />Figure 2.2-2 shows the location of buildings and other facilities. Figure 2.2-6 shows <br />buildings and other facilities located in the vicinity of the portal bench. <br />Portal Level <br />Crushing and Screening Building <br />The conveyor belt exits the mine and discharges into a crushing and <br />screening facility. This facility houses a 7 foot X 16 foot double deck screen <br />and a triple roll crusher. The crushing and screening building is a pre- <br />engineered steel building 30 feet X 20 feet with at 15 foot eave height. The <br />foundation for the crushing and screening facility is a concrete pad with wing <br />walls. <br />Transfer Belt <br />A 40 -foot long 48 -inch conveyor collects sized coal from the screen and <br />crusher and conveys the product to the stacking belt. <br />Radial Stacker Belt <br />The sized product from the crushing and screening facility is conveyed to a <br />coal stockpile by a 120 -foot 36 -inch radial stacker belt. The radial stacker <br />wheels are supported by a retaining wall and concrete runway. <br />Substation <br />The 3MV substation is supported by six concrete footers which are two feet <br />wide. A gravel surfaced fenced area approximately 12' wide X 40' long. <br />Shop <br />A pre-engineered metal building located on the portal level to store supplies <br />and to repair and fabricate equipment. The building is approximately 40 feet <br />by 80 feet with a 12 foot eave height. <br />PR -02 2.05-8- 10/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.