2018-01-12_REVISION - M2000041 (32)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000041
>
2018-01-12_REVISION - M2000041 (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 8:19:24 AM
Creation date
1/16/2018 1:31:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000041
IBM Index Class Name
Revision
Doc Date
1/12/2018
Doc Name
Adequacy Review Response #2
From
Fremont Paving and Redi-Mix
To
DRMS
Type & Sequence
TR4
Email Name
ERR
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Elliott R. Russell <br /> January 4, 2018 <br /> Page 5 <br /> well, located up-gradient of the back-filled pit and within the permit boundary to be <br /> controlled by either the Operator or the mine site landowner. This location will also <br /> more accurately monitor the effects of groundwater mounding. <br /> A new well will be installed as shown in revised Appendices E and H. <br /> 24. Within the Groundwater Monitoring Plan (Appendix H), the Operator states wells will <br /> be initially monitored on a monthly basis until the completion of the slurry wall <br /> construction then quarterly for the life of mine. Please define the completion of the <br /> slurry wall construction.Additionally, the Division believes monthly monitoring should <br /> occur for at least one year after the completion of the slurry wall to help define the <br /> groundwater regime and understand immediate mounding effects. Please revise the plan <br /> accordingly. <br /> Construction of the slurry wall should begin within 60 days of DRMS approval of TR-4. <br /> The construction should take of the order of 120 days. A 90-day leak test will be <br /> conducted with approval expected in 30 days, and construction will be considered <br /> complete at that time. The revised Appendix H is attached. <br /> 25.In response to Adequacy Review Item #12, the Operator included the Table I Cost <br /> Estimate to construct the slurry wall. Within Table I Cost Estimate, the costs associated <br /> with the five tasks under "Work Items by Fremont Paving"were not provided. Please <br /> provide the cost estimate to complete each of these work item tasks. <br /> A revised Table 1 is attached. <br /> We believe this response properly addresses the adequacy items. Please call if you have any <br /> questions or comments. <br /> Sincerely, <br /> DEERE&AULT CONSULTANTS, INC. <br /> Don W. Deere, P.E. <br /> Principal <br /> DWD:sp <br /> Attachments <br /> Q.\0212 Stonewall Spnngs\0212 010 Southwest Reservoir Slurry Wall\DRMS Comment And Response\September 2017 ResponsesUanuary 2018 Response\Adequacy Review Response To <br /> Comments TR-04 M-20000-041.Ltr.Docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.