My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-11_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-01-11_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 12:59:35 PM
Creation date
1/11/2018 12:45:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
1/11/2018
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
Colowyo Coal Company
Type & Sequence
RN7
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br />TRUCK/LOADER TEAM WORK <br />Task description: Remove and dispose of Rip rap from ditches, D1, D2, D3, D4 <br />Site: Color -,o Coal Mine Permit Action: 13C Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 026 State: Colorado <br />Date: 3/15/2017 County: Moffat_ <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />■ i urn a..�wuci • cauI - a I urn. <br />-Loader: <br />%-UL f �_.p <br />CAT 95N <br />Support Equipment -Load Area: <br />-Dump Area: <br />NA <br />Cat D9T - <br />ad Maintenance Motor Grader: <br />-Water Truck: <br />NA <br />NA <br />C_nst Breakdown: Truck/i.nader Team <br />Abbreviation: None <br />Filename: 0019-026 <br />Shift basis: 1_per dax <br />Sunnnrt Frntinment Maintenanre. Frminment <br />Total work team cosVhour: $528.98 <br />MATERIAL QUANTITIES <br />Initial volume: 2,168 CCY Swell factor: 1.000 <br />Loose volume: 2,168 LCY <br />Source of estimated volume: Ex. 7-2313, Table 1 <br />Source of estimated swell factor: _ Cat Handbook _ <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 3,300 Pounds/LCY <br />Description: Decomposed rock - 75% Rock, 25% Earth <br />Rated Payload: 52,000 Pounds <br />Payload Capacity: 15.76 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />50 <br />NA <br />NA <br />Ownership cost/hour: <br />$54.66 <br />$25.38 <br />NA <br />$100.59 <br />NA <br />NA <br />Operating cost/hour: <br />$38.75 <br />$28.79 <br />NA <br />$43.62 <br />NA <br />NA <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />NA <br />Operator cost/hour: <br />$30.37 <br />$41.20 <br />NA <br />$41.85 <br />NA <br />NA <br />Unit Subtotals: <br />$123.78 <br />$95.37 <br />NA <br />$186.05 <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />l <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$342.93 <br />Support: <br />$186.05 <br />Maint: <br />$0.00 <br />Total work team cosVhour: $528.98 <br />MATERIAL QUANTITIES <br />Initial volume: 2,168 CCY Swell factor: 1.000 <br />Loose volume: 2,168 LCY <br />Source of estimated volume: Ex. 7-2313, Table 1 <br />Source of estimated swell factor: _ Cat Handbook _ <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 3,300 Pounds/LCY <br />Description: Decomposed rock - 75% Rock, 25% Earth <br />Rated Payload: 52,000 Pounds <br />Payload Capacity: 15.76 LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.