Bulldozer Worksheet Cont'd Task # 025 Page 2 oft <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />1.426 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.868 <br />Blade type: <br />1.000 <br />Net correction: 0.6657 <br />Adjusted unit production: 931.98 LCYlhr <br />Adjusted fleet production: 931.98 LCYlhr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.185/LCY <br />Total job time: 7.39 Hours <br />Total job cost: $I,271 <br />(I SHIFT/DAY) <br />(FND-RF) <br />(CAT HB) <br />_ (CAT HB) <br />(CAT HB) <br />(PAT) <br />