Laserfiche WebLink
Scraper Worksheet Cont'd Task # 006 Page 1 of 2 <br />Task description: <br />SCRAPER TEAM WORK <br />Haul Topsoil to Collom Haul Road <br />Site: Colowyo Coal Mine Permit Action: 13C Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 006 State: Colorado <br />Date: 311512017 County: Moffat <br />User. ZTT <br />Agency or organization name: DBMS <br />HOURLY EQUIPMENT <br />Abbreviation: None <br />Filename: C019-006 <br />COSTShift basis: lamer day <br />Equipment Description <br />-Scraper: Cat 637G <br />-Dozer: NA <br />...... — ---- - <br />Support Equipment -Load Area: NA <br />-Dump Area: TNA <br />Road Maintenance —Motor Grader: i CAT 16M <br />-Water Truck: . Water Tanker, 5,000 Gal. <br />Cost Breakdown: 5crarner Wnrk Team Sumort Fauinment Maintenance Fnuinment <br />Total work team cost/hour: $2.773.85 <br />MATERIAL QUANTITIES <br />Initial volume: 322,807 CCY Swell factor. 1.125 <br />Loose volume: 363,158 LCY <br />Source of estimated volume: Table 7 Exh. 13B -T-20 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$143.40 <br />NA <br />NA <br />NA <br />$72.40 <br />$24.01 <br />Operating cost/hour: <br />$153.53 <br />NA <br />NA <br />NA <br />$14.49 <br />$8.53 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$31.26 <br />NA <br />NA <br />NA <br />$28.90 <br />$0.00 <br />Unit Subtotals: <br />$328.19 <br />NA <br />NA <br />NA <br />$115.79 <br />$32.54 <br />Number of Units: <br />8 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$2,625.52 <br />Support: <br />$0.00 <br />Maint: <br />$ I48.33 <br />Total work team cost/hour: $2.773.85 <br />MATERIAL QUANTITIES <br />Initial volume: 322,807 CCY Swell factor. 1.125 <br />Loose volume: 363,158 LCY <br />Source of estimated volume: Table 7 Exh. 13B -T-20 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,65_0 lbs/LCY <br />Material description: <br />Decomposed rock - 25% Rock, <br />34.00 <br />75% Earth <br />Rated Payload: <br />_ <br />81,600 pounds <br />Payload Capacity: <br />30.79 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />