Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 005 Page 2 of 2 <br />Job efficiency: _ <br />0.830 <br />Spoil pile: <br />1.000 <br />Push gradient: <br />0.903 <br />Altitude: <br />0.930 <br />Material Weight: <br />0.868 <br />Blade type: <br />1.000 <br />Net correction: 0.4356 <br />Adjusted unit production: 1,250.30 LCYIhr <br />Adjusted fleet production: 5001.2 LCY/hr <br />JOB TIME AND COST <br />Fleet size: <br />4 Dozer(s) <br />Unit cost: <br />$0.379{LCY <br />Total job time: <br />414.90 Hours <br />Total job cost: <br />$786,095 <br />(l SHIFTIDAY) <br />(DOZ-OC) <br />(C_AT HB) <br />T (CAT HB) <br />(CAT HB) <br />(PAT) <br />