Laserfiche WebLink
To: Jared Ebert <br /> Date: January 2, 2018 <br /> Page 34 <br /> The ditches were simulated in the groundwater model. Mine dewatering was projected to <br /> increase ditch losses by a few percent for the Little Cache and Taylor and Gill, <br /> respectively, during mining. After mining, ditch losses are expected to decrease due to <br /> lining of the pits. The results section of the groundwater modeling report provides <br /> estimates on the increased losses due to dewatering. Sections 6 and 7 of the revised <br /> groundwater report provides a monitoring and mitigation plan to measure for and <br /> mitigate excessive ditch losses. <br /> RULE 6.4.19 — EXHIBIT D — PERMANENT MAN-MADE <br /> STRUCTURES <br /> Comment 4 <br /> 4. The Taylor and Gill Ditch and lateral is within 200 feet of the affected land. These <br /> structures are not included in Exhibit S. Please provide the required documentation <br /> to fulfill the requirements of Rule 6.4.19. <br /> Response 4 <br /> The Taylor and Gill Ditch and seven other structure owners have been identified and <br /> added to Exhibit S and shown on Sheet 1 of Exhibit C (Attachment 1). The table of <br /> parcels and structures is included in Response 2 above. The lateral is on LRM property <br /> and was not added to Exhibit S. The proof of mailings is in Attachment 3. <br /> Sincerely, <br /> �Op•REG/S <br /> Telesto olutions nc. SEE Hi F <br /> v•3 <br /> 326 <br /> Walt L. ccoli, P.E. �13i� i.•` <br /> Principal/Senior Engineer SSbNAL <br /> WN:tme <br /> Enclosures: Attachment 1 —Revised Exhibit C <br /> Attachment 2—Revised Exhibit F <br /> Attachment 3 —Proof of mailing for structures within 200 <br /> Attachment 4—Revised Exhibit G: Figure 2 and Sheets 1, 2, and 3 <br /> Attachment 5 —Reclamation Cost Spreadsheet <br /> Attachment 6—Reclamation Cost Calculation Documentation <br /> Attachment 7—Revised Exhibit S, Geotechnical Stability Analysis <br /> Response to DRMS comments T E L E S T <br />