My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-03_PERMIT FILE - M2017036 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017036
>
2018-01-03_PERMIT FILE - M2017036 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2021 2:47:38 AM
Creation date
1/4/2018 12:32:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017036
IBM Index Class Name
Permit File
Doc Date
1/3/2018
Doc Name
Adequacy Review Response
From
Loveland Ready-Mix Concrete
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: Jared Ebert <br /> Date: December 29, 2017 <br /> Page 24 <br /> in inches. <br /> Conveyors (portable) Dimensions L, W, <br /> Conveyors (non-portable) Cubic Feet(L x W x H <br /> Storage tanks (aboveground) Gallons <br /> Storage tanks (underground) Gallons <br /> Powerlines Liner Feet <br /> d. Mining at the site will expose groundwater. Given this, the Division needs to <br /> hold a bond to cover the cost of either backfilling the pit to a point above the <br /> water table or a cost to isolate the pit from groundwater inflow by either <br /> installing a clay liner or slurry wall. Given LRM's choice of the installation of <br /> a clay liner as part of the proposed mining and reclamation plan, please <br /> provide the information necessary to conduct an estimate of the cost for the <br /> installation of the proposed clay liner assuming mining stops at the end of <br /> Phase H. This cost should include the cost for placing and compacting the <br /> clay material in lifts and for quality control measurements to insure the clay <br /> material is installed at the proper compaction specification. Since the <br /> material to construct the liner is found onsite, please also include a cost of <br /> excavating the necessary material. <br /> e. Please provide the information necessary to calculate the cost of the <br /> installation of the French Drain and riser system. <br /> f. Please provide the anticipated maximum length of highwall to be in place at <br /> any given time during mining of Phase 1 and II. Please provide an estimate of <br /> the volume needed to grade this highwall to the proposed 3H:1 V slope. <br /> g. Please provide a basis for the pit pumpdown costs. <br /> h. Please provide an estimate of the volume of topsoil to be replaced. <br /> i. Regarding revegetation costs,please provide an estimate of.• <br /> i. Seed cost per acre. <br /> ii. Cost for proposed tree and shrubs. <br /> iii. Planting and seeding costs. <br /> j. Please include a cost for mobilization and demobilization of equipment to the <br /> site to complete reclamation <br /> Response 46 <br /> The attachments containing the unit quantities and rates used to produce the summary <br /> table in Exhibit L of the original submittal were not included as DRMS has pointed out. <br /> We have included two attachments, Attachment 5 — Reclamation Cost Spreadsheet and <br /> Attachment 6 — Reclamation Cost Calculation Documentation, to this response and <br /> provided the specific information requested in the comment letter herein. <br /> Response to DRMS comments T E L E S T G <br />
The URL can be used to link to this page
Your browser does not support the video tag.