Laserfiche WebLink
COST SUMMARY WORK <br />Task description: PR8 Addition of proposed ponds <br />Site: Trapper Mine Permit Action: PR8 Permit/Job#: C1981010 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 12/12/2017 County: Moffat <br />User: RAR <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C010-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />Regrade 5 proposed ponds, in Deacon, Jeffway and <br />DOZER <br />1 <br />107.80 <br />$29,677.00 <br />Deal drainages <br />Replace Topsoil on 5 ponds in Deacon, Deal, and <br />SCRAPERI <br />9.74 <br />002 <br />1 <br />$33,941.00 <br />JeffWay drainages <br />Seed 5 pond areas with rangeland shrub mix <br />REVEGE <br />25.00 <br />003 <br />1 <br />$19,821.00 <br />SUBTOTALS: <br />142.54 <br />$83,439 <br />INDIRECT COSTS <br />$1,685.47 <br />OVERHEAD AND PROFIT: <br />$876.11 <br />Liability insurance: <br />2.02 <br />Performance bond: <br />1.05 <br />Job superintendent: <br />71.27 <br />Profit: <br />10.00 <br />Total = <br />$1,685.47 <br />Total = <br />$876.11 <br />Total = <br />$5,206.27 <br />Total = <br />$8,343.90 <br />TOTAL O & P = <br />$16,111.75 <br />CONTRACT AMOUNT (direct + O & P) = <br />$99,550.75 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 <br />Engineering work and/or contract/bid preparation: 4.25 <br />Reclamation management and/or administration: 5.00 <br />CONTINGENCY: 0.00 <br />Total = 0.00 <br />Total = $4,230.91 <br />$4,977.54 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $25,320.19 <br />TOTAL BOND AMOUNT (direct + indirect) = $108,759.19 <br />