Laserfiche WebLink
XVIII. Operations on Prime Farmland <br />No prime farmlands currently exist within the proposed permit area. Therefore any <br />specific approvals under this section do not apply. <br />XIX. Mountaintop Removal <br />No specific approvals are granted to the applicant under this section. <br />XX. Operations on Steep Slopes <br />No specific approvals are granted to the applicant under this section. <br />XXI. In Situ Processing <br />No specific approvals are granted to the applicant under this section. <br />XXII. Reclamation Cost Estimate <br />DRMS updated the reclamation cost estimate in February 2017 to reflect 2017 CRG, Means <br />and CDOT rates. This updated estimate total is $21,270,012.72. Included in the estimate <br />are permitting actions reflecting reclamation tasks identified in the permit for the following <br />revisions that included an increase in liability since the last updated with Permit Revision <br />PR7 as follows: <br />o Bond Release No. 17 <br />o Technical Revision No. 115 <br />o Minor Revision No. 223 <br />o Permit Renewal No. 8 <br />This Permit Renewal PR8 revised cost estimate added $108,759.19 to the previous <br />reclamation cost estimate of $21,825,290.66 for a total reclamation liability of <br />$21,934,049.85. <br />23 <br />