Laserfiche WebLink
<br />Haul road construction near loadout. <br /> <br />SUPPORT FACILITIES - Rule 4.04: <br />The Collom Water Tank pad appears to be completed. No associated facilities have been constructed on top of the <br />pad at the time of the inspection. The water line that runs from the water ta nk area has been installed and buried. <br /> <br />TOPSOIL – Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />Topsoil Pile 25A continues to be constructed. Visible containment ditches can be seen surrounding the pile <br />ensuring all topsoil stays within the approved footprint. <br /> <br /> <br />DOCUMENTS RECEIVED <br />OTHER (SPECIFY) <br /> <br />