My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-02_INSPECTION - C1981019
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2018-01-02_INSPECTION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2018 1:23:48 PM
Creation date
1/2/2018 1:13:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
1/2/2018
From
DRMS
To
Colowyo Coal Company
Inspection Date
12/11/2017
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL and GRADING – Rule 4.14 <br />Contemporaneous Reclamation 4.14.1; Approximate Original Contour 4.14.2; Highwall Elimination 4.14.1(2)(f); <br />Steep Slopes 4.14.2, 4.27; Handling of Acid and Toxic Materials 4.14.3; Stabilization of Rills and Gullies 4.14.6: <br />Backfilling and grading work is being conducted by scrapers along on the western area of the Collom Facility <br />Area. <br /> <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discha rge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br />Drainage – Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9 ; Stream Buffer Zones 4.05.18: <br />The Streeter Pond was inspected and held water but does not appear to be discharging due to the visible low water <br />level. Embankments are stable and no issues are observed. <br /> <br />The Work Area Pond holds water and is stable. <br /> <br />The Temporary Facilities and Wilson Storage Ponds along the temporary Collom work area held water as well <br />with no issues. <br /> <br />The Section 25 Pond along the Collom Facility Area held minimal water with no discharge. <br /> <br />Streeter Pond. Temporary Facilities and Wilson Storage Ponds. <br /> <br />ROADS – Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3) <br />Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) <br />Reclamation 4.03.1(7)/4.03.2(7): <br />Collom Haul Road construction continues. Scraper crews were visibly working along the lower section of the haul <br />road near the loadout. Water trucks were running alon g the length of the haul road.
The URL can be used to link to this page
Your browser does not support the video tag.