Laserfiche WebLink
slopes capable of being traversed by farm machinery with no slopes steeper than <br /> 2-4:1. Soils andsTopsoil, overburden, and interburden respreadingplacement, <br /> as well as all yegetatien „feeedures e dingy, will be required on 98.5 +/- acres. <br /> Our estimate of costs for the various reclamation items are as follows: <br /> Item Units Rate Unit Total <br /> Backfill and grade 341,435 0.39 $/yd $133,160 <br /> Replace topsoil 74,000 0.49 $/yd $36,260 <br /> Reseed 99 391.18 $/ac $38,531 <br /> Rip roads-pads-scarify 99 200.00 $/ac $19,800 <br /> Labor $25,000 <br /> Misc $10,000 <br /> Mob/Demob $2,500 <br /> Subtotal $265,251 <br /> Profit& Overhead 13.10 % $34,748 <br /> Subtotal $299,999 <br /> DMG Fee 5.00 % $15,000 <br /> TOTAL BOND $314,999 <br /> RECOMMEND BOND BE SET AT $315,000 <br /> 51 Revised Oeteber-December 2017 <br />