Laserfiche WebLink
expected that 50%of the traffic will move south of Alma and 50%will move north of <br /> Alma. <br /> The projected final use of the site is high altitude rangeland, residential, and ponds. The <br /> reclamation plan calls for much smoother surfaces obtained by overburden replacement and <br /> compaction, placement of topsoil or substitute topsoil on all areas, and seeding and tree sapling <br /> planting and monitoring. Wetland areas are planned along the ponds and will be retained after <br /> reclamation as shown on the Reclamation Plan Map F-1. It is believed that the nature of this plan <br /> will be mutually beneficial to the Town of Alma and the Operator. <br /> 9. Import Materials <br /> On occasion, topsoil or overburden may be imported to the site to be used in reclamation. To <br /> ensure that all imported materials are clean and inert the individual or company delivering <br /> material to the facility is required to sign an affidavit certifying that material is clean and inert, <br /> states the original source, and the estimated volume. A blank affidavit can be found at the end <br /> of this exhibit. <br /> Alma Placer Mine t:rep 1.a,..i And U.Kutm PIA <br /> December 2017 D-14 <br />