Laserfiche WebLink
EXHIBIT C — MINING/MILLING PLAN <br /> Per Rule 6 requirements, the Gold Hill Mill Waterline operations will substantively <br /> conform to the following described mining plan. <br /> (1) MINING/MILLING PLAN <br /> Colorado Milling Company, LLC proposes to install the Left Hand Creek <br /> Pump Station and the Gold Hill Mill Pipeline during the earliest time period <br /> when the weather permits the heat-fusion welding to connect the HDPE <br /> two (2) inch pipeline. Because this task can only be accomplished during <br /> warm weather, the installation will likely occur between the months of April <br /> and October. <br /> (a) Period of Mining/Milling <br /> Colorado Milling Company, LLC proposes to commence pumping <br /> operations upon receipt of applicable permits and applications. It is <br /> anticipated that this can be accomplished by approximately mid-2018. <br /> Ultimate project life will be dependent upon precious metal prices. <br /> (b) Topsoil Management Plan <br /> There are no areas containing appreciable amounts of topsoil that will be <br /> disturbed during the installation of the Left Hand Creek Pump Station, the <br /> Gold Hill Mill Pipeline, or the use of the Times Mine adit portal. The <br /> 11conex" containing the pump and generator will not disturb the land <br /> surface on the South side of Left Hand Creek, because it will be resting on <br /> the surface of the ground, which is composed entirely of gravel deposited <br /> by the fluvial action of the creek. The Gold Hill Mill Pipeline will also be <br /> resting on the surface of the land along the length of the Pipeline <br /> Easement, except for a few areas where it will be buried to permit foot <br /> traffic on historic mine access roads. There is no topsoil present in the <br /> area in front of the Times Mine portal. <br /> (c) Overburden/Waste Rock Management Plan <br /> There are no areas where overburden or waste rock will be disturbed <br /> during the installation of the Left Hand Creek Pump Station, the Gold Hill <br /> Mill Pipeline, or the use of the Times Mine adit portal. <br /> (d) Thickness of the Deposit to be Mined <br /> Not applicable to this Permit Amendment Application. <br /> Exhibit C— Mining/Milling Plan 1 <br />