Laserfiche WebLink
November 29, 2017 C-1981-019/Colowyo Coal Mine ZTT <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 6 of 8 <br /> <br />TOPSOIL – Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />Topsoil was placed along the 2017 West Pit reclamation parcels. Containment berms were placed around the <br />topsoiled area to prevent topsoil from leaving into adjacent areas as well as keeping runoff from backfilled areas <br />from entering. No issues were observed. <br /> <br />All topsoil piles along the Collom Haul Road have been completed. Topsoil pile 25 A was currently being shaped <br />as topsoil continues to be placed as the facility area is being stripped. Topsoil Pile 25 A was surrounded by a <br />containment berm as well as sediment control fences. Each pile was clearly marked. No issues were observed. <br /> <br /> <br /> <br />