Laserfiche WebLink
Trapper Mine; C-1981-010 <br />Permit Renewal No. 7 (RN07) <br />PROJECT IDENTIFICATION <br />Date: 11 -Jul -17 Permit C-1981-010 Site: Trapper Mine <br />User: JDM State: Colorado <br />County: Moffat <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Permit Renewal No. 7 (RN07) <br />Revegetation Costs <br />Task <br />Task Description <br />Task Hours <br />Direct Cost <br />KO1 <br />Seed Facilities area; Rangeland w/o Shrubs <br />74 <br />$11,890.00 <br />K02 <br />Seed Road etc.; Rangeland w/o Shrubs <br />132.3 <br />$57,322.00 <br />K03 <br />Seed D/E Pit; Rangeland w/o Shrubs <br />32.2 <br />$13,951.00 <br />K04 <br />Seed BC Road; Rangeland w/o Shrubs <br />58.2 <br />$25,216.00 <br />K05 <br />Seed Ash Pit; Rangeland w/o Shrubs <br />45 <br />$19,497.00 <br />K06 <br />Seed Middle Pyeatt Ponds; Rangeland w/o Shrubs <br />5.7 <br />$2,470.00 <br />K07 <br />Seed Topsoil Piles; Rangeland w/o Shrubs <br />9 <br />$3,899.00 <br />K08 <br />Seed Roads, etc.; Rangeland with Shrubs <br />65.4 <br />$51,851.00 <br />K09 <br />Seed AE Pit; Rangeland with Shrubs <br />327 <br />$259,256.00 <br />K10 <br />Seed D/E Pit; Rangeland with Shrubs <br />268.5 <br />$212,875.00 <br />Kl l <br />Ash Pit; Rangeland with Shrubs <br />123.7 <br />$98,073.00 <br />K12 <br />Seed KLM Pits; Rangeland with Shrubs <br />644.3 <br />$510,821.00 <br />K13 <br />Seed ZS Pits; Rangeland with Shrubs <br />166.9 <br />$132,324.00 <br />K14 <br />Seed F Pit; Rangeland with Shrubs <br />120.1 <br />$95,219.00 <br />K15 <br />Seed Coyote Pond; Rangeland with Shrubs <br />14 <br />$11,100.00 <br />K16 <br />Seed Sage Pond; Rangeland with Shrubs <br />11.5 <br />$9,118.00 <br />K17 <br />Seed Deal Pond; Rangeland with Shrubs <br />3 <br />$2,378.00 <br />K18 <br />Seed West Horse Pond; Rangeland with Shrubs <br />3.9 <br />$3,092.00 <br />K19 <br />Seed Far East Buzzard Pond; Rangeland with Shrubs <br />0.5 <br />$396.00 <br />K20 <br />Seed Topsoil Piles; Rangeland with Shrubs <br />27.7 <br />$21,961.00 <br />K21 <br />Shrub Transplant; 14 New Clumps <br />391.82 <br />$155,204.00 <br />K22 <br />Seed Erosion Control Ditches <br />136.01 <br />$19,458.00 <br />K23 <br />Drainage Stabilization <br />320 <br />$447,000.10 <br />Total Hours and Direct Cost <br />2980.73 $2,164,371.10 <br />JDM 7 7/11/2017 <br />