Laserfiche WebLink
PROJECT IDENTIFICATION <br />Date: 11 -Jul -17 <br />User: JDM <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Permit Renewal No. 7 (RN07) <br />Topsoil Replacement Cost <br />Task Task Description <br />Trapper Mine; C-1981-010 <br />Permit Renewal No. 7 (RN07) <br />Permit C-1981-010 Site: Trapper Mine <br />State: Colorado <br />County: Moffat <br />Task Hours Direct Cost <br />JO 1 <br />Replace Topsoil on Ash Pits <br />60.09 <br />$209,507.00 <br />J02 <br />Replace Topsoil on Ash Pit <br />176.6 <br />$397,258.00 <br />J03 <br />Replace Topsoil on D/E Pits <br />41.53 <br />$144,790.00 <br />J04 <br />Replace Topsoil on D/E Pits <br />522.8 <br />$1,176,017.00 <br />J05 <br />Replace Topsoil on ZS Pits <br />103.56 <br />$361,074.00 <br />J06 <br />Replace Topsoil on F Pit <br />294.41 <br />$662,260.00 <br />J07 <br />Replace Topsoil on AE Pits <br />183.97 <br />$641,398.00 <br />J08 <br />Replace Topsoil on AE Pits <br />62.33 <br />$121,096.00 <br />J09 <br />Replace Topsoil on KLM/G Pit <br />257.59 <br />$898,076.00 <br />J10 <br />Replace Topsoil on KLM/G Pit <br />430.71 <br />$968,854.00 <br />J11 <br />Replace Topsoil on West Panel Ponds, BC Road and Shop <br />10.15 <br />$35,377.00 <br />J12 <br />Replace Topsoil on West Panel Ponds, BC Road and Shop <br />306.36 <br />$689,131.00 <br />J13 <br />Replace Topsoil on East Panel Ponds & A Road <br />62.97 <br />$219,551.00 <br />J14 <br />Replace Topsoil on East Panel Ponds and A Road <br />157.52 <br />$354,329.00 <br />Total Hours and Direct Cost <br />2670.59 $6,878,718.00 <br />JDM 6 7/11/2017 <br />