My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-29_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2017-11-29_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 8:05:40 AM
Creation date
12/8/2017 7:58:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
11/29/2017
Doc Name Note
Findings RN7 Enclosed Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining, Inc.
Permit Index Doc Type
Findings
Email Name
RAR
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
there will never be more than four ungraded spoil rows (including the active one) at any one <br />time. <br />Topsoiling and Seeding <br />After final grading of the spoil ridges, topsoil is placed on the spoil to a depth of 18 inches on <br />cropland and 12 inches on rangeland. A variation of+/- 2 inches is allowed due to compaction <br />and operational considerations. Areas are then seeded with one of three main seed mixes, <br />depending on the elevation. Seed mixes contain various native grasses, forbs and shrubs, while <br />the lowest elevation site seed mix contains only grasses and forbs. Shrub clumps of <br />approximately 1.6 acres are also located throughout the reclaimed areas. Seeding occurs by both <br />drill and broadcasting methods. <br />Long -Term Ash Disposal Plan <br />The applicant continues to backfill Ashmore pit with ash from the Craig Power Plant. Ash will <br />also be disposed in Enfield/Derringer pit. The ash is approximately 60% fly ash, 20% bottom <br />ash, and 20% scrubber sludge. A maximum of 5,250 tons per day of the waste will be disposed <br />of at the Trapper Mine with an average of 1,222 tons per day expected. This is equivalent to an <br />average annual volume of waste of about 231 acre-feet, after compaction. The applicant expects <br />this waste burial process will continue for the life of the mine. Down -gradient ground water <br />monitoring wells are in place to detect any potential degradation of the ground water due to <br />leachate through the ash waste pile. <br />Page 12 <br />Trapper RN7 Prepared by: R. Reilley <br />Nov 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.