My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-20_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2017-11-20_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2017 9:49:21 AM
Creation date
11/21/2017 9:48:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
11/20/2017
Doc Name Note
RN4
From
DRMS
To
Bowie Resources, LLC
Permit Index Doc Type
Findings
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minor Revision No. 182 was received on June 1, 2015, deemed complete and approved on June 3, 2015. <br />The revision proposed to incorporate revised construction permit no. 98DL0726 into the permit application <br />package. <br />Minor Revision No. 183 was received on September 29, deemed complete and approved on October 5, <br />2015. The revision proposed to install a SmartDitch liner for the outlet of culvert G-2 and into Pond D. <br />The SmartDitch liner, identified as T -F6, is required to repair and prevent erosion at the outlet of culvert G- <br />2. <br />Minor Revision No. 184 was received on November 24, 2015, deemed complete and approved on <br />December 2, 2015. The revision proposed to revise the location of temporary culvert T -Flat Gob Pile #2. <br />No update to the hydrology for culvert T -F 1 is required as the approved design was previously adequate. <br />Minor Revision No. 185 was received on December 15, 2015, deemed complete and approved on December <br />21, 2015. The revision proposed to revise and update the approved drill hole sealing information. The <br />revised information reflects drill hole abandonment information submitted to the Division during October <br />and November of 2015. <br />Minor Revision No. 186 was received on May 5, 2016, deemed complete and approved on May 6, 2016. <br />The revision proposed to revise approved permit application text and maps to include an existing light use <br />road within the Bowie No. 2 Mine permit. <br />Minor Revision No. 187 was received on May 27, 2016, deemed complete on June 3, 2016, and approved <br />on February 7, 2017. The revision proposed to revise the Bowie No. 2 Mine permit to update the <br />identification of interests section of the permit. The update included revised ownership and control <br />information. <br />Minor Revision No. 188 was received on July 19, 2016, deemed complete and approved on July 26, 2016. <br />The revision requested a change in the requirement date to replace the damaged monitoring well DH -15. A <br />replacement deadline date of July 31, 2016 was requested to be revised to October 31, 2016. <br />Minor Revision No. 189 was received on September 12, 2016, deemed complete on September 12, 2016, <br />and approved on September 13, 2016. The revision proposed to add a new temporary culvert located near <br />the second bench of Gob Pile #2. <br />Minor Revision No. 190 was received on October 10, 2016, deemed complete and approved on October <br />12, 2016. The revision proposed to revise the location of temporary culvert T6 located near the second <br />bench of Gob Pile #2. <br />Minor Revision No. 191 was received on November 1, 2016, deemed complete and approved on November <br />7, 2016. The revision proposed to revise the location of temporary culvert T F-1 located near the fourth <br />bench of Gob Pile #2. <br />Minor Revision No. 192 was received on February 14, 2017, deemed complete on February 23, 2017 and <br />approved on February 27, 2017. The revision proposed to update the drillhole tables in the Bowie No.2 <br />Mine permit. The tables were updated to include the results of the SL -02 Bond Release. <br />Minor Revision No. 193 was received on May 16, 2017, deemed complete on May 23, 2017 and approved <br />on June 1, 2017. The revision proposed a minor change to the West Terror Creek monitoring during <br />temporary cessation. The application also included a completion diagram for a new drill hole, DH -15A. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.