Minor Revision No. 170 was received on January 13, 2015, deemed complete and approved on January 13, <br />2015. The revision proposed to construct concrete fender walls at the base of the refuse bine. The <br />reclamation performance bond was increased to cover the costs of the reclamation of the fender structures. <br />The fender structures were constructed within the approved disturbance area. <br />Minor Revision No. 171 was received on January 9, 2015, deemed complete and approved on January 9, <br />2015. The revision proposed to relocate a previously approved cover material stockpile to the second bench <br />of Gob Pile #2, within an area approved for disturbance. <br />Minor Revision No. 172 was received on January 13, 2015, deemed complete on January 22, 2015, and <br />approved on January 27, 2015. The revision proposed to incorporate the results of the 2014 Monitoring <br />Well Rehabilitation Project into the approved permit. <br />Minor Revision No. 173 was received on January 23, 2015, deemed complete and approved on January 30, <br />2015. The revision proposed to relocate and extend the approved Gob Pile #2 temporary culvert T -F1. <br />Minor Revision No. 174 was received on February 3, 2015, deemed complete on February 5, 2015, and <br />approved on February 10, 2015. The revision proposed to update that approved drill holes and drill hole <br />road locations based on the survey data and update Map 9 of the approved Permit Application Package. <br />There was one acre of proposed disturbance based on the survey. <br />Minor Revision No. 175 was received on February 6, 2015, deemed complete and approved on February <br />10, 2015. The revision proposed to incorporate the 2014 Midterm Review Reclamation Cost Estimate into <br />the Permit Application Package. <br />Minor Revision No. 176 was received on February 9, 2015, deemed complete and approved on February <br />12, 2015. The revision proposed to provide updates to the Underground Openings Table to reflect the <br />abandonment of drill holes SS -6 and SS -8. <br />Minor Revision No. 177 was received on February 5, 2015, deemed complete on February 13, 2015, and <br />approved on February 23. The revision proposed to increase the slope angle near the truck refuse bin and <br />to update the disturbed area boundary on Map 18. <br />Minor Revision No. 178 was received on February 18, 2015, deemed complete and approved on February <br />26, 2015. The revision proposed to include a method to assess the state of reclamation and stability of <br />remote borehole sites into the Permit Application Package and removal of alternative sediment control <br />measures associated with the borehole pads when found to no longer be needed. <br />Minor Revision No. 179 was received on March 4, 2015, deemed complete and approved on March 5, 2015. <br />The revision proposed to incorporate specification and design information relating to the alternative channel <br />lining for channel erosion protection. <br />Minor Revision No. 180 was received on March 30, 2015, deemed complete and approved on April 2, 2015. <br />The revision proposed to incorporate the use of 30" half culvert or a trapezoidal "smart ditch" liner in the <br />approved J15 culvert location. <br />Minor Revision No. 181 was received on May 11, 2015, deemed complete and approved on May 18, 2015. <br />The revision proposed to extend culvert B-8 within the facilities area by 50 feet. <br />