My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-03_PERMIT FILE - C2010089 (2)
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2017-10-03_PERMIT FILE - C2010089 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2017 10:18:48 AM
Creation date
11/17/2017 10:14:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Permit File
Doc Date
10/3/2017
Doc Name
Air Pollution Control Permti No. 10MO2275F
Section_Exhibit Name
Appendix 2.05.6(1)-1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4) This facility is classified as follows: <br />Applicable Requirement Status <br />Operating Permit Minor: PM, S02i NOx, CO <br />PSD Minor: PM, S02i NOx, CO <br />5) The permit holder is required to pay fees for the processing time for this permit. An invoice for <br />these fees will be issued after the permit is issued. The permit holder must pay the invoice <br />within 30 days of receipt of the invoice. Failure to pay the invoice will result in revocation of <br />this permit (Reference: Regulation Number 3, Part A, Section VI.B.) <br />6) Unless specifically stated otherwise, the general and specific conditions contained in this <br />permit have been determined by the Division to be necessary to assure compliance with the <br />provisions of Section 25-7-114.5(7)(a), C.R.S. <br />7) Each and every condition of this permit is a material part hereof and is not severable. Any <br />challenge to or appeal of a condition hereof must constitute a rejection of the entire permit <br />and upon such occurrence, this permit must be deemed denied ab initio. This permit may be <br />revoked at any time prior to self -certification and final authorization by the Division on grounds <br />set forth in the Colorado Air Pollution Prevention and Control Act and regulations of the AQCC <br />including failure to meet any express term or condition of the permit. If the Division denies a <br />permit, conditions imposed upon a permit are contested by the applicant, or the Division <br />revokes a permit, the applicant or owner or operator of a source may request a hearing before <br />the AQCC for review of the Division's action. <br />8) Section 25-7-114.7(2)(a), C.R.S. requires that all sources required to file an Air Pollutant <br />Emission Notice (APEN) must pay an annual fee to cover the costs of inspections and <br />administration. If a source or activity is to be discontinued, the owner must notify the Division <br />in writing requesting a cancellation of the permit. Upon notification, annual fee billing will <br />terminate. <br />9) Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention <br />and Control Act or the regulations of the AQCC may result in administrative, civil or criminal <br />enforcement actions under Sections 25-7-115 (enforcement), -121 (injunctions), -122 (civil <br />penalties), -122.1 (criminal penalties), C.R.S. <br />Paee 6 of 7 <br />®� <br />COLORADO <br />Air Pollution Control Division <br />UC[> r—It 0 IUldc 111,, h 6 L, 1, invent <br />
The URL can be used to link to this page
Your browser does not support the video tag.