Laserfiche WebLink
Gloria Z Bond Calculation <br />Method <br />Cost per <br />Cost for Regrading <br />unit <br />Remaining steep highwall (50') <br />E97E222tCY. <br />Dozer <br />-$0.55 <br />53472 <br />knocked down to 3H:1V(-700 ft.) <br />Junk removal <br />6000 <br />Tree and slash niaterialTemoval <br />500 CY <br />$104 <br />5200 <br />Topsoil remaining disturbed <br />36 acres <br />$583 <br />21000 <br />areas <br />Disking and harr6wing-6f topsoil <br />36 acres <br />$150 <br />5400 <br />Seeding and mulching <br />36 Acres <br />$500 <br />18000 <br />Direct Cost Total <br />$109,072 <br />Indirect cost (28%) <br />$30,540 <br />Total <br />$139,632 <br />Based on these costs the new total bond for the Gloria Z Pit should be $139,612. The current <br />bond is $108,234, therefore an additional $31,378 will be posted. <br />Please contact me if you have any further questions or concerns. <br />Sincerely, <br />Ben Langenfeld, P.B. <br />Greg Lewicki and Associates <br />Gloria Z Pit 2 _ _ sm nix <br />