Laserfiche WebLink
EXHIBIT E RECLAMATION PLAN (coNT) <br /> of the area in the permit will not be disturbed by mining, <br /> because it is in setbacks around the permit lines or non-clay <br /> bearing areas . Figure E-1 is a color rendition of the reclamation <br /> plan showing the various final land forms on the Reclamation Plan <br /> Map. <br /> Reclamation Timetable <br /> The numbers presented below represent our estimate of the <br /> various areas of disturbance in the reclamation Areas . They may <br /> change as the actual mining progresses through the site . <br /> RECLAMATION TIMETABLE (revised 1/3/2017) <br /> Area` Years Total Revegetation Road Area <br /> Area Area (ac± ) <br /> (ac± ) (ac± ) <br /> A 3-5 72.9 71.6 1.3 <br /> B 3-5 21.7 21.7 0.0 <br /> C 3-5 32.2 32.2 0.0 <br /> D 3-5 71.0 70.4 0.7 <br /> E 3-5 224.2 223.0 1.2 <br /> E1 3-5 27.7 27.7 0.0 <br /> E2 3-5 36.0 36.0 0.0 <br /> F 3-5 152.5 151.7 0.8 <br /> S 3-5 120.3 115.0 0.3 <br /> Misc (i.e. set- <br /> backs, and 0 288.3 0.0 0.0 <br /> undisturbed, <br /> etc.) (ac± ) <br /> Grand Totals 1,046.8 749.3 4.3 <br /> *areas are only used to explain the mining areas,not the direction or timing of the mining operations. <br /> 9a (revised 11/13/17) <br />