Laserfiche WebLink
EXHIBIT E RECLAMATION PLAN (CONT) <br /> The current Reclamation Plan for Area A, calls for the base <br /> of the clay bed to be graded and any side slopes to be graded 3h <br /> to lv by cut/fill sloping from the original surface to the mine <br /> floor. This applies to all 3 layers of material and required <br /> blasting of the rock face to make it 3 : 1 . <br /> That changes in this amendment, so as to leave the solid <br /> sandstone layer with a near vertical face and only slope the <br /> unconsolidated layers above and below it at 3h to lv. As noted <br /> in the Mining Plan, the sandstone face will not exceed 25 feet <br /> high without a 20 foot wide bench being constructed on the face . <br /> The excess overburden, unusable clay and sandstone process- <br /> ing waste will be used to build the slopes and some of the <br /> overburden will be used to place at least 6 inches of cover on <br /> any exposed bedrock as root zone . <br /> As mining progresses on the working face, the perimeter <br /> slopes on the clay seam and unconsolidated material will be <br /> graded at, or flatter than 3h to 1v as discussed in the Mining <br /> Plan. This will ensure that when mining ceases, only a minor <br /> amount of work will have to be done to finish reclamation in the <br /> disturbed area. The salvaged topsoil/growth medium will then be <br /> placed on the seedbed and seeded using the approved seed mix <br /> listed below. No trees or shrubs will be planted as we expect <br /> natural invasion of those species to occur and no trees were <br /> included in the approved revegetation plan. <br /> SEED MIX (1990) <br /> SPECIES VARIETY %MIX LBS (PLS) <br /> Fairway Wheatgrass Ephraim 60 3 .60 <br /> Pubescent Wheatgrass Luna 35 4.90 <br /> Yellow Sweetclover 5 0.35 <br /> Total 100 8 . 85 <br /> Seeding rates are given in pounds of Pure Live (PLS)PLS purity x germination <br /> Roads will be left across the mine to provide access for <br /> planting crews, and for the supervision and inspection of the <br /> completed reclamation. These roads will remain when mining ends <br /> to ensure the owner ' s access to the site. Final grading on the <br /> roads will be done before any Area is closed. <br /> All refuse will be hauled away or disposed of in a manner <br /> that will control unsightliness and protect the drainage system <br /> from pollution. There are no acid-forming or toxic materials <br /> involved with the operation. <br /> Final revegetation will be done by the end of the second <br /> fall after resoiling is completed. The Area will be monitored <br /> for success of revegetation until accepted by the Division for <br /> release . If revegetation failures occur prior to release, an <br /> analysis of the site will be made and the area will be revege- <br /> tated again as necessary. <br /> The reclamation timetable shows the types and amount of land <br /> in each Area when reclamation is complete . Approximately 22 . 3% <br /> 9 (revised 11/13/17) <br />