My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-13_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2017-11-13_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:31:09 PM
Creation date
11/15/2017 9:01:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
11/13/2017
Doc Name
Adequacy Review Response #2
From
Sunrise Mining
To
DRMS
Type & Sequence
AM2
Email Name
LJW
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response: A new Figure A-1 is included in our reply, and the boreholes have <br /> been removed. <br /> c. The shape of the permit area in Figure A-1 is inconsistent with any previously <br /> submitted maps depicting the permit boundaries. Furthermore, the scale of Figure <br /> A-1 is inaccurate and there is no list of acreages to verify with the narrative of <br /> Exhibit A. Please include these details in the revised Figure A-1. <br /> Response: Section 21 was omitted from Figure A-1 causing the inconsistency <br /> in the shape of the permit area. A revised Figure A-1 is included in the new <br /> set of maps in our reply and includes both Sections 21 and 28 and accurate <br /> scale. <br /> d. The "corners" of the permit boundary are depicted by red dots in Figure A-l. <br /> While they are clearly identified; a list of the GPS coordinates for each of the <br /> corners was requested by the Division and was not included. Please submit a list <br /> of the GPS Coordinates for each of the corners that corresponds to the corrected <br /> Figure A-1. <br /> Response: A revised Figure A-1 is included in the new set of maps in our <br /> reply and includes the GPS Coordinates for each of the corners. <br /> 3. Exhibit C — Pre-Mining and Mining Plan Maps of Affected Lands <br /> a. In the narrative of the affected lands as well as Exhibit D, Mining Plan, the May <br /> Day 1 East and the May Day 2 East are discussed. Enlarged maps are not <br /> included with Exhibit C. Please clarify that no disturbances are currently planned <br /> for these areas. The applicant needs to commit that if a disturbance is planned in <br /> those areas it will be addressed through the Technical Revision Process and <br /> enlarged maps will be included at that time. <br /> Response: No disturbances are currently planned for the May Day No. 1 <br /> East and May Day No. 2 East areas. Sunrise Mining, LLC commits that if a <br /> disturbance is planned in these areas, it will be addressed through the <br /> Technical Revision Process and enlarged maps will be included at that time. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.