Laserfiche WebLink
ACOM <br />Technical Memorandum — 3 Dam Reslope Project <br />October 5, 2017 <br />Page 7 <br />Photo 7 -- View of regraded downstream slope on July 18, looking south. <br />Photo 8 —View of excess tailings being placed at south end of stepback area (July 18). <br />