My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-09_REVISION - M1973007SG
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973007
>
2017-11-09_REVISION - M1973007SG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:41 PM
Creation date
11/13/2017 12:29:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973007SG
IBM Index Class Name
Revision
Doc Date
11/9/2017
Doc Name Note
As-built documents for new wash fines disposal pond
Doc Name
Quality Assurance Monitoring/Test Results
From
Transit Mix Concrete Co.
To
DRMS
Type & Sequence
TR5
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rr <br />.� Transit Mix Concrete Co. <br />BRIERLEY <br />6122/?1)17 <br />ASSOCIATES <br />DAILY FIELD REPORT <br />Project <br />Daniel Sand [Valli Fine Pit <br />Location <br />Colorado Springs- CO <br />Client <br />Transit Mix <br />Contractor <br />Piouecr Saud Civil Coustrcnou <br />NVenther <br />Partly cloudy:sunny <br />Report No. 009 <br />Date <br />6122/?1)17 <br />Page <br />2 oft <br />File No. <br />$16051-000 <br />Temperature <br />57-94"7 <br />At 0820 hours. oix scraper placed hft soil on northern portion of the enibanlrtuuent <br />At 0821 hours, one scraper placed lift soil on norther portion of the embanb ucnt. <br />At 0826 hours. one scraper placed hft soil nu northern portion of the ernbatikmant <br />At 0831 hatirs. one scraper placed lift soil on northern portion of the embankment <br />At 0836 hours, out scraper placed hA soil on norther portion of the embankment <br />At 0837 hours, one scraper placed lilt sod on uorthern portion of the aubatlauent. <br />At 0840 hours. one scraper placed lift soil on northern portion of tlx embanlauent. <br />At 0845 hours. one scraper placed lift soil on nortLier portion of the embaulauent. Spraying micron <br />anbantmlent lift <br />At 0846 hours_ one scraper placed lift soil on northern portion of the embarkment <br />At 0850 hours_ one scraper placed lift soil on norther portion of the embanlauent. <br />Equipment onsite consisted of Deere 850K crawler dozer. CAT 9501L CAT 638 wish paddle, CAT 627K, <br />CAT 613C with 5000 gallon tack. CAT 623G_ CAT wheel tractor scraper pith open bowl_ elevated nater <br />rmik <br />1I. FIELD REPRESENTATIVE'S ACTWITIES: <br />Sarah Myers was onsite frout 0650 ins to 0900 hrs to inspect embaudaueut progre" and lift placerurut <br />operations. <br />III_ OTHER ONSITE AGENCY ACTIVITIES <br />Hauling operations from the quarry -.Itroughout shift <br />Field Representative- Sarah Myers <br />Simiature � �- <br />Pape 2 of 2 <br />90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.