Laserfiche WebLink
rr <br />.� Transit Mix Concrete Co. <br />BRIERLEY <br />6122/?1)17 <br />ASSOCIATES <br />DAILY FIELD REPORT <br />Project <br />Daniel Sand [Valli Fine Pit <br />Location <br />Colorado Springs- CO <br />Client <br />Transit Mix <br />Contractor <br />Piouecr Saud Civil Coustrcnou <br />NVenther <br />Partly cloudy:sunny <br />Report No. 009 <br />Date <br />6122/?1)17 <br />Page <br />2 oft <br />File No. <br />$16051-000 <br />Temperature <br />57-94"7 <br />At 0820 hours. oix scraper placed hft soil on northern portion of the enibanlrtuuent <br />At 0821 hours, one scraper placed lift soil on norther portion of the embanb ucnt. <br />At 0826 hours. one scraper placed hft soil nu northern portion of the ernbatikmant <br />At 0831 hatirs. one scraper placed lift soil on northern portion of the embankment <br />At 0836 hours, out scraper placed hA soil on norther portion of the embankment <br />At 0837 hours, one scraper placed lilt sod on uorthern portion of the aubatlauent. <br />At 0840 hours. one scraper placed lift soil on northern portion of tlx embanlauent. <br />At 0845 hours. one scraper placed lift soil on nortLier portion of the embaulauent. Spraying micron <br />anbantmlent lift <br />At 0846 hours_ one scraper placed lift soil on northern portion of the embarkment <br />At 0850 hours_ one scraper placed lift soil on norther portion of the embanlauent. <br />Equipment onsite consisted of Deere 850K crawler dozer. CAT 9501L CAT 638 wish paddle, CAT 627K, <br />CAT 613C with 5000 gallon tack. CAT 623G_ CAT wheel tractor scraper pith open bowl_ elevated nater <br />rmik <br />1I. FIELD REPRESENTATIVE'S ACTWITIES: <br />Sarah Myers was onsite frout 0650 ins to 0900 hrs to inspect embaudaueut progre" and lift placerurut <br />operations. <br />III_ OTHER ONSITE AGENCY ACTIVITIES <br />Hauling operations from the quarry -.Itroughout shift <br />Field Representative- Sarah Myers <br />Simiature � �- <br />Pape 2 of 2 <br />90 <br />