Laserfiche WebLink
rF <br />Transit Mix Concrete Co. <br />BRiERLEY <br />ASSOCIATES <br />C.4.1.-, <br />DAILY FIELD REPORT <br />Project <br />Daniel Sand SVash Fine Pit <br />Reporl .No. <br />009 <br />Location <br />Colorado Sprigs. CO <br />Date <br />G 22.2017 <br />Client <br />Transit hit..- <br />Pape <br />1 of 2 <br />Contractor <br />Pioneer Saud Civil Construction <br />File 1o. <br />516051-000 <br />Weather <br />Partly cloudy/sunny <br />Temperature <br />57_114-F <br />I. CONTRACTOR'S ACHVETEUS: <br />Pioneer crew consisted of 6 laborers_ Robert (foreman) onsite in the morning. In general the embankment <br />is lcvcl/siurilar clevatiou from station 1+00 to B+00 In order to reach the crest clevatiou, approximately <br />3.5 feet of soil still needs to be added. <br />Four sctapcts continuously placed lilt material %vitluu cmbaulaucut footprint_ CAT 63_k scraper was out <br />of commission and being serviced throughout the shift In order to compact the lifts- the scrapers drove <br />over the placed soil with a full bowl for tate madrnum amount of weight. Lift soil is being transported <br />Gni the onsite uotthent stoclgtile/bormw ores assigzred by Traiisit t+lix Stoclrile cvusiNts of brouu iilty <br />sand and clayey sand a7th approximately 6 percent moisture content. <br />At 0720 hours, nvo scrapers placed lift soil near station 1+00 <br />At 0735 hours. one scraper placed lift soil. <br />At 0728 hours, one scraper placed lift soil hear station 2+00. <br />At 0730 hours, dozer cutting slope near station 8+00 <br />At 0734 Lotus, one scraper placed lift soil near station 1+00. <br />At 0735 hours, one scraper placed lift soil near station 2+00. One scraper placed soil near station 1+50. <br />At 0736 hours, one scraper placed lift soil uear statiou 1+75. <br />At 0742 hours_ one scraper placed lift soil near station 5+00. One scraper placed soil near station 4+50. <br />At 0713 hours_ one scraper placed lift soil near station 4+00. One scraper placed soil near station 3+00. <br />At 0745 hours, water tank truck sprayed water on the lifts in order to increase the moisture content of the <br />silty sand. <br />At 0750 hours. four scrapers placed lift soil on northern portion of the embanbucut. <br />At 0800 hours. three scrapers placed lift soil on northern portion of the embanlantent <br />At 0805 hours, dozer levehug top of eutbaulnneut. <br />At 0806 Lotus, one scraper placed lift soil on vorthern portion of the etttbatnlauent. <br />At 0807 hours, one scraper placed lift soil on norther[ portion of the embankment. <br />At 0808 hours, dozer working on westem side shopes near the northern portion of the embattianent. One <br />scraper placed sod on norther portion of the embankinent <br />At 0815 hours one scraper placed lift sod on ttatihem portion of the nnbanlanent <br />Pause 1 of 2 <br />99 <br />