My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-09_REVISION - M1973007SG
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973007
>
2017-11-09_REVISION - M1973007SG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:41 PM
Creation date
11/13/2017 12:29:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973007SG
IBM Index Class Name
Revision
Doc Date
11/9/2017
Doc Name Note
As-built documents for new wash fines disposal pond
Doc Name
Quality Assurance Monitoring/Test Results
From
Transit Mix Concrete Co.
To
DRMS
Type & Sequence
TR5
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r; <br />Transit Mix Concrete Co. <br />BRIERLEY <br />ASSOCIATES <br />DAILY FIELD REPORT <br />Project <br />Daniel Saud Wash Fine Pit <br />Report \o. <br />006 <br />Location <br />Colorado Springs. CO <br />Date <br />5131+2017 <br />Cheat <br />Transit Mix <br />Page <br />2 of 2 <br />Contractor <br />Pioncer Sand Civil Construction <br />File No, <br />516051-000 <br />Weather <br />Partlycloudy <br />Temperature <br />51-74`F <br />At 08381rrs. scraper placing sotllliil from station 2+00 to 4+50 <br />At 0840 Iirs. scraper placing soil4ift from starian 2+00 to 4-50 <br />At 0941 Irrs. dozer leveling the eastern toe of the northern lifts. Puadmg waren Acted near toe from statim <br />2.00 to 3+00. <br />At 0844 lrrs. two scrapers placing sorIllift from station 2+00 to 4+50 <br />At 0850 Inrs. scraper placing soiMift from station 2+00 to 4+50. <br />At 0851 lus. scraper placing soil/lift from station 2+00 to 4+50- <br />At 0855 hrs. scraps placing soilflift from station 2+00 to 4+50. <br />At 1}857 Ins. scraper placing soil/lift front station 2+00 to 4+50. <br />At 0900 hrs. Jill front Eutech using unclear density gauge at two locations along northern lift. Lift passed <br />with a density if 116.1 and moisture content of 6 84 percent Due to the cousitcarency of lire txutoty area <br />stockpile Bcialey stated less frequent tests due to similar results <br />At 0905 hrs- two scrapers placing soiV1if► from station 3+00 to 4-50. CAT 6I3C ptnciug waxer oa uarthert <br />lift portions. <br />At 0907 hrs. scraper placing sonUhft front station 2+00 to 4+50. CAT 613C filling up water umL <br />Equipment onsite consisted of: Deere 850K crawler dozer. CAT 950H. CAT 628 with paddle. CAT 627K. <br />CAT 6 t3C tsith 5000 gallon tank CAT 623G. CAT wheel tractor scrrper % ittt open bowl- elcv atcd 111rer <br />tal& <br />H. FIELD REPRESENTATIVE'S ACTWn-WS: <br />San, h Myers was onsite frim 0700 hrs to 0930 hrs to inspect key rxcavaiiou and Litt placement operatious. <br />M. OTHER ONSITE AGENCY ACTIY3TWS <br />Harding operations from the quarry thioucltaut {Inift <br />Field Representative: Sarah Myers <br />pa Gr � of' - <br />72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.