Laserfiche WebLink
rr <br />a Transit Mix Concrete Co. <br />BRIERM <br />ASSOCIATES <br />DAILY FIELD REPORT <br />Project <br />Daniel Sand Alasht Fine Pit <br />Report No. <br />006 <br />Location <br />Colorado Sprints, CO <br />Date <br />5 31:2017 <br />Client <br />Transit Mix <br />Page <br />1 of 2 <br />Contractor <br />Protteer Satid Civil Construction <br />Flle .No. <br />516051-000 <br />Weallirr <br />Partly cloudy <br />Temperature <br />51-74°F <br />1. CON'TRACTOR'S ACTTIrTMS: <br />Piaueer crew cotisisted of 5 Iaborcrs. Two of the laborers were from Monks Construction. Robert <br />bforeman) was onsite in the morning. New haul road still las some "soft" spots therefore isn't fully <br />operational for hauling operations. CDOT class 6 has leen placed within northern portion. <br />From 0710 to 0907 lits, CAT 613C full of wafer drove from station 2+00 to 4+50 in order to compact the <br />{ail. <br />At 0720 bts. scraper placing sod/lifl from station 2+00 to 4+50. Lift soil is no longer being excavated from <br />within the pond footprint due to wet soil conditions. Pond'ntg water noted in sevetnl places within pond <br />footprint. Lilt soil is being transported from the ousite northeru stockpile:borrow area assigued by Transit <br />Mix. Stockpile consists ofbrown silty sand and clayey sand. <br />At 0730 lis, nvo scrapers plating soilllift from station 3+00 to 4-50. Dozer Ieveling pond footprint. <br />Front 0720 to 0730 his, Jill from Entech using micleat density gaiige at two locations along northern lift. <br />Lift passed. <br />At 0740 Ins. scraper placing soil/hft from station 2+00 to 4+50. <br />At 0745 hrs, scraper placing soUM from station 2+00 to 4-50. <br />At 0755 Ins. two scrapers placing sod/lift from station 2+00 to 4+50. <br />At 4804 los. scraper placing soilflnfl from station 2+00 io 4+50. <br />At 0802 ]in. two scrapers placing soilllitl front station 2+00 to 4+50. <br />At 08101us, two scrapers placing soil/hfl from station 3+00 to 4+50. <br />At 0815 lus_ scraper placing soil/1ift &ani station 2+00 to 4+50. <br />At 0816 lus_ scraper placing sod on new haul route toad. <br />At 08191". scraper placing sod/lift front siation 2+00 to 4+50. <br />At 0821 his, scraper placing soil/hft front station 2+00 to 4+ 50. <br />At 0825 lits. scraper placing soil on new haul route road. <br />At 0826 las. scraper placing sodflift fraini station 2+00 to 4+50. <br />At 0830 lus. scraper placing soil/lift from station 3+00 to 4+50. <br />At 0831 hrs_ dozer leveling northern portion of hft placement from station 4+00 t0 4+50 <br />At 0834 his_ scraper placing soil/lift from station 3+00 to 4+50. <br />Pout 1 of 2 <br />71 <br />