Laserfiche WebLink
October 25, 2017 C-1980-004/McClane Canyon Mine JHB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 0 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 5 <br /> <br />Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6): <br /> The haul road to the portal appears to have been graded fairly recently. A storm has caused minor <br />rilling on the road, but this runoff ends up in the roadside ditch and eventually to the sediment pond, so is not <br />considered to be a problem. The road all the way to the portal area is in good condition. <br />CAM Mining has submitted a revision to the Munger Permit to transfer a reclaimed access road and emergency <br />drill pad located in Monger Canyon from the McClane Canyon Permit to the Munger Canyon permit. Once <br />This revision is approved, McClane Canyon Mining will need to submit a revision to remove thes features form <br />the McClane permit. <br /> <br />The gates and locks to the site were functional and appeared in good repair. <br /> <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br /> Operations at the mine site are idle. No mine personnel are at the site full time. Regular maintenance <br />is conducted periodically. Reclamation of the site has not commenced. Seeded out slopes of the sediment pond <br />are well vegetated. The topsoil stockpile slopes have been stabilized with a temporary seed mix. This appears <br />to have been effective in stabilizing the top and slopes of the pile. <br /> <br />SLIDES and DAMAGE - Rule 4.12: <br /> Some down cutting over culvert/ditch D-5 was noticed. This culvert functions to direct overland flow <br />into a perimeter ditch and does not receive vehicle traffic. The culvert is shown on figure 2.2-3. This down <br />cutting of material does not affect the function of this culvert. <br /> <br />The rest of the site is in good condition leading into the Winter months. <br /> <br /> <br />DOCUMENTS RECEIVED NA <br />OTHER (SPECIFY) NA <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />