My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-03_INSPECTION - M1977151
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977151
>
2017-11-03_INSPECTION - M1977151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2017 7:58:52 AM
Creation date
11/6/2017 7:45:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977151
IBM Index Class Name
Inspection
Doc Date
11/3/2017
Doc Name
Inspection Report
From
DRMS
To
R M Hiner Construction Co Inc
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Jared Dains, P.E. Page 8 of 9 <br /> May 7, 2015 <br /> 19. Dewatering is not expected to occur at this site during the SWSP approval period. However, in <br /> the event that dewatering will occur at the site during the SWSP approval period, note that as <br /> long as the pit is continuously dewatered, the water returned to the stream system should be <br /> adequate to offset the depletions. Once dewatering at this site ceases, the delayed <br /> depletions must be addressed, including depletions resulting from the gradual refilling of the <br /> pit. At least three years prior to completion of dewatering, a plan must be submitted that <br /> specifies how the post pumping dewatering depletions (including refilling of the pit) will be <br /> replaced in time, place and amount. <br /> 20. This substitute water supply plan may be revoked or modified at any time should it be <br /> determined that injury to other water rights has or will occur as a result of this plan. Should <br /> this substitute water supply plan expire without renewal or be revoked prior to adjudication <br /> of a permanent plan for augmentation, all excavation of product from below the water table, <br /> and all other use of water at the pit, must cease immediately. <br /> 21. In accordance with amendments to § 25-8-202-(7), C.R.S. and "Senate Bill 89-181 Rules and <br /> Regulations" adopted on February 4, 1992, the State Engineer shall determine if this <br /> substitute water supply plan is of a quality to meet requirements of use to which the senior <br /> appropriation receiving the substitute supply has normally been put. As such, water quality <br /> data or analyses may be requested at any time to determine if the requirement of use of the <br /> senior appropriator is met. <br /> 22. The decision of the state engineer shall have no precedential or evidentiary force, shall not <br /> create any presumptions, shift the burden of proof, or serve as a defense in any pending <br /> water court case or any other legal action that may be initiated concerning this plan. This <br /> decision shall not bind the state engineer to act in a similar manner in any other applications <br /> involving other plans, or in any proposed renewal of this plan, and shall not imply <br /> concurrence with any findings of fact or conclusions of law contained herein, or with the <br /> engineering methodologies used by the Applicant. <br /> If you have any questions concerning this approval, please contact Sarah Brucker in Denver at <br /> (303) 866-3581 or Michael Hein in Greeley at (970) 352-8712. <br /> Sincerely, <br /> i A <br /> p <br /> (yik Jeff I-; erage, P.E. <br /> Chief of Water Supply <br /> Attachments: Figure 1 (Vicinity Map) <br /> Figure 2 (Pre/Post 1981 Exposed Area) <br /> Figure 2 (Exposed Area Map) <br /> Tables 1 - 5 <br /> Bucklen Equipment Co., Inc. lease <br /> City of Aurora lease <br /> April 30, 2010 letter from DRMS <br /> Water Right Dedication Affidavit for 3.0 GIC shares <br />
The URL can be used to link to this page
Your browser does not support the video tag.