My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-03_INSPECTION - M1977151
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977151
>
2017-11-03_INSPECTION - M1977151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2017 7:58:52 AM
Creation date
11/6/2017 7:45:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977151
IBM Index Class Name
Inspection
Doc Date
11/3/2017
Doc Name
Inspection Report
From
DRMS
To
R M Hiner Construction Co Inc
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Jared Dains, P.E. Page 7 of 9 <br /> May 7, 2015 <br /> the attached Division One Administration Protocol "Use of Replacement Sources Not <br /> Specifically Identified in an SWSP or Augmentation Plan". <br /> 10. All releases of replacement water must be sufficient to cover all out-of-priority depletions in <br /> time, place, and amount and must be made under the direction and/or the approval of the <br /> water commissioner. The release of replacement water may be aggregated to maximize <br /> beneficial use. The water commissioner and/or the division engineer shall determine the rate <br /> and timing of an aggregated release. The Applicant is required to coordinate with the water <br /> commissioner the delivery location of replacement water to ensure out-of-priority depletions <br /> are adequately replaced to prevent injury to other water rights. <br /> 11. The water attributable to the 3.0 shares of the GIC must continue to be diverted in priority at <br /> the ditch and then measured back to the Cache la Poudre River in the vicinity of the Greeley <br /> Pit. Adequate measuring devices acceptable to the water commissioner must be installed. <br /> 12. All pumping for dust control purposes shall be measured in a manner acceptable to the <br /> division engineer. <br /> 13. Adequate accounting of depletions and replacements must be provided to the division <br /> engineer in Greeley (DivlAccounting@state.co.us) and the water commissioner (Mark Simpson <br /> at Mark.Simpson®state.co.us) on a monthly basis or other interval acceptable to both of <br /> them. The accounting form provided with your application is subject to modification and <br /> approval by the division engineer. All amounts shall be in acre-feet. Submitted accounting <br /> shall conform to the Administration Protocol "Augmentation Plan Accounting, Division One - <br /> South Platte River" (attached). <br /> 14. The name, address, and phone number of the contact person who will be responsible for the <br /> operation and accounting of this plan must be provided on the accounting forms submitted to <br /> the division engineer and the water commissioner. <br /> 15. Conveyance toss for delivery of augmentation water is subject to assessment and modification <br /> as determined by the water commissioner or division engineer. <br /> ` ' 16. If reclamation of the mine site will produce a permanent water surface exposing groundwater <br /> to evaporation, an application for a plan for augmentation must be filed with the Division 1 <br /> Water Court at least three years prior to the completion of mining to include, but not be <br /> limited to, long-term evaporation losses and lagged depletions. If a lined pond results after <br /> reclamation, replacement of lagged depletions shall continue until there is no longer an <br /> effect on stream flow. Granting of this plan does not imply approval by this office of any such <br /> court application(s). <br /> 17. For the purposes of this SWSP, the previously submitted affidavit dedicating 3.0 GIC shares as <br /> ' ' replacement water solely to this SWSP will be accepted for the dedication of the shares; <br /> however, if the State Engineer determines that a different affidavit or dedication process is <br /> necessary to assure proper dedication of the shares, additional information may be required <br /> prior to future SWSP approvals. A copy of the dedication for the additional 2.5 shares <br /> obtained by the Applicant must be provided to this office. <br /> 18. Approval of this SWSP does not relieve the Applicant of their obligation to actively pursue the <br /> acquisition of these additional shares of GIC water or develop an alternate plan for achieving <br /> compliance with the DRMS's April 30, 2010 letter. Prior to future approvals the Applicant <br /> must dedicate additional water to this plan or propose other steps that will be taken to <br /> itprevent the exposure of additional ground water at the pit and associated long term <br /> augmentation requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.