My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-02_REVISION - M1977023 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977023
>
2017-11-02_REVISION - M1977023 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:35:17 PM
Creation date
11/3/2017 8:03:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977023
IBM Index Class Name
Revision
Doc Date
11/2/2017
Doc Name
Application
From
Oldcastle SW Group, Inc. dba United Companies
To
DRMS
Type & Sequence
AM1
Email Name
DMC
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D MINING PLAN <br /> 1. General Mining Plan <br /> The permit area for the Ready Mix Pit is 76.0 acres. 7.3 acres of that area will be disturbed as part <br /> of mining operations. 17.9±acres will be the processing and stockpiles area. The remaining area <br /> consists of previously reclaimed ponds, access roads, and undisturbed areas. Sand and gravel for <br /> use in making construction materials products will be mined onsite. Crushing, screening, and <br /> washing of material will all take place on site. Asphalt and concrete production will take place on <br /> site. Reclamation will occur concurrently with mining, as mining progresses from east to west. <br /> Table D-1 shows the area breakdown for the site. <br /> Table D-1 Mining Areas <br /> Mining Phase Area <br /> Processing 17.9 Acres <br /> Mining 7.3 Acres <br /> Reclaimed Ponds 31.3 Acres <br /> Undisturbed 19.5 Acres <br /> Total 76.0 Acres <br /> Mining will stay 30 feet from the north,west, and south fences, and at least 100 feet from the <br /> reclaimed pond to the east. Setbacks of this size ensure the protection of outside structures from <br /> excavation related impacts. <br /> Topsoil and overburden berms may be constructed inside the above listed setbacks as part of noise <br /> and visual mitigation. <br /> Blasting will not take place at the Ready Mix Pit. <br /> 2. Mining Timetable <br /> Production is planned at around 150,000 tons per year. The deposit is believed to contain roughly <br /> 600,000 tons. Based on these calculations,the pit could be mined out in approximately six years. <br /> However, market forces dictate aggregate production, and therefore the mine life discussed here is <br /> an estimation based on applicant experience. <br /> Ready Mix Pit October 2017 D- 1 X (avg l ewirkf and Associates.PLL( <br />
The URL can be used to link to this page
Your browser does not support the video tag.