Laserfiche WebLink
Page 6 of 13 <br />BULLDOZER WORK <br />Task description: Regrade Access Roadto NW Vent Shaft <br />Site: New Ilk Mne Permit Action: Technical Revision 72 Perniit/Job#: C1981012 <br />PROJECT IDENTIFICATION <br />Task#: A02 State: Colorado Abbreviation: None <br />Date: 5/9/2017 County: Las Animas Filename: C012 -A02 <br />User. CCW <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $200.46 <br />Total Fleet Cost/Hour: $200.46 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,111 <br />Swell factor: 1.165 <br />Loose volume: 1,294 LCY <br />Source ofestimated volume: Division ofReclamation, Mining & Safety <br />Source ofestimatedswell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Averagepush distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Averagepush <br />gradient: <br />Averagesite altitude: <br />Material weight: <br />TR -72 <br />50 feet <br />1,400.0 LCY/hr <br />Compacted fill orembankment 0.9 <br />-5% <br />7,300 feet <br />9001bs/LCY <br />Page TR- 6 <br />Revised 7/10/2017 <br />CIRCES Cost Estimating SoSware <br />Utilization % <br />$83.81 <br />NA <br />$66.17 <br />100 <br />$7.55 <br />NA <br />$1.08 <br />15 <br />$41.85 <br />NA <br />Total unit Cost/Hour: $200.46 <br />Total Fleet Cost/Hour: $200.46 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,111 <br />Swell factor: 1.165 <br />Loose volume: 1,294 LCY <br />Source ofestimated volume: Division ofReclamation, Mining & Safety <br />Source ofestimatedswell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Averagepush distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Averagepush <br />gradient: <br />Averagesite altitude: <br />Material weight: <br />TR -72 <br />50 feet <br />1,400.0 LCY/hr <br />Compacted fill orembankment 0.9 <br />-5% <br />7,300 feet <br />9001bs/LCY <br />Page TR- 6 <br />Revised 7/10/2017 <br />CIRCES Cost Estimating SoSware <br />