Laserfiche WebLink
October 24, 2017 C-2009-087/Peabody Sage Creek Mine TNL <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 0 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 4 of 6 <br /> <br />DOCUMENTS RECEIVED <br />OTHER (SPECIFY) <br />Current permitting actions: <br />SL4: Division is reviewing adequacy response from operator received via email 10/27/2017 <br />RN1: Division sent adequacy letter 4/3/2015 noting 24 items. Awaiting response from the operator. Current <br />decision due date is 11/17/2017. <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br /> <br />PHOTOGRAPHS <br /> <br /> <br />Repaired pipe from Pond 2 Pond 4; both NPDES 5 and 6 were flowing <br /> <br /> <br />Rock Check Dams placed along road F1