My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-21_PERMIT FILE - M1983090
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1983090
>
2017-10-21_PERMIT FILE - M1983090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:31:07 PM
Creation date
10/25/2017 11:00:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983090
IBM Index Class Name
PERMIT FILE
Doc Date
10/21/2017
Doc Name
Adequacy Review Response
From
Bestway Concrete
To
DRMS
Type & Sequence
AM2
Email Name
ECS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> Mr. Eric Scott <br /> September 29, 2017 <br /> (g)Show the owner's name, type of structures, and location of all permanent or man-made structures <br /> contained on the area of affected land and within two hundred(200)feet of the affected land. -All <br /> structures are shown on the maps to the best of the permitees knowledge. <br /> (h)In conjunction with Exhibit l-Soils information, Subsection 6.4.9, soils information may be presented on <br /> map in this section. Soils map legend is shown on 'Map 3"but soils data seems to be given on 'Map 2a"- <br /> please revise for consistency. -Map 2a has been updated and contains no soils data. <br /> EXHIBIT E-Reclamation Plan(Rule 6.4.5) <br /> (2)(e)A plan or schedule indicating how and when reclamation will be implemented.. <br /> The permittee will need to specify at this time if the proposed reclamation for the "wildlife pond"and the <br /> pond immediately east of the wildlife pond as depicted on the provided maps will be reclaimed as a lined <br /> reservoir, unlined reservoir, or backfilled to original grade, This also applied to the exposed groundwater <br /> ponds located within the permit located south of the Cache La Poudre River. -Discussions have been <br /> ongoing concerning the Wildlife Pond between the Miner,The Town of Windsor and Central <br /> Colorado Water Conservancy District. The current plan is to reclaim 75%of the pond as potential <br /> wetlands and 25%to be uplands. There has also been significant discussions concerning slurry <br /> lining the pond and using if for water storage but the plan has been to reclaim 75%of the pond as <br /> open water/wetlands. <br /> The permitted will also need to provide detailed information to describe how lined reservoir within the <br /> floodolain will be constructed to withstand flood events. Installation of armored in/et/outlet structures to <br /> provide controlled filling and draining of reservoirs is common method to prevent reservoir failure during <br /> flood events. -The La Poudre River flooded in 1999 and as a result damage occurred to the slurry <br /> lined ponds and the Sinclair Gas/Oil Line bisecting those two pits. Around 1999/2000 Tuttle <br /> Applegate designed a spillway to convey water over and into the most downstream pond (east <br /> pond). The spillway design included modeling the 100-year flow of 690 cfs and conservatively <br /> analyzed the downstream east pond as half full,therefore resulting in higher erosion forces along <br /> the spillway path. The spillway was constructed between the two ponds and located at a low point <br /> to convey flows safely between the two ponds. During the 2013 flood the Site received significant <br /> flooding but no major damage to the slurry wall embankments occurred. <br /> The reclamation cost breakdown required for Exhibit L should reflect the reclamation option chosen for <br /> these exposed groundwater areas. - The reclamation cost breakdown includes all ponds as slurry <br /> lined ponds. The bond has not changed and includes the entire boundary of 284.4 acres. <br /> EXHIBIT F-Reclamation Plan(Rule 6.4.6): The map(s)of the proposed affected land, by all phases of the <br /> total scope of the mining, shall indicate the following. <br /> (a) The expected physical appearance of the area of the affected land, correlated to the proposed mining <br /> and reclamation timetables. The map must show proposed topography of the area with contour lines of <br /> sufficient detail to portray the direction and rate of slope of a//reclaimed lands;and-The reclamation <br /> plans include the timetable to reclaim the outstanding mined out area. The exhibit also shows the <br /> contours and slopes. <br /> (b)Portrayal of the proposed final land use for each portion of the affected lands. -The reclamation plan <br /> map shows the ultimate reclamation of the mined out areas. <br /> EXHIBIT G- Water Information(Rule 6.4.6). <br /> (2)if the operation is expected to directly affect surface or groundwater systems,you shall: <br />
The URL can be used to link to this page
Your browser does not support the video tag.