My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-19_INSPECTION - M2009076
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2009076
>
2017-10-19_INSPECTION - M2009076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2021 5:06:08 AM
Creation date
10/20/2017 10:04:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009076
IBM Index Class Name
Inspection
Doc Date
10/19/2017
Doc Name
Corrective Action Resolution Notice
From
Venture Resources
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Michael Cunningham — October 11, 2017 <br /> Page Two <br /> 3) Division concurrence and written authorization to allow VRI to curtail monthly groundwater <br /> monitoring (effective with the recently completed September event—results attached) and <br /> a return to the "quarterly" monitoring frequency (effective with the upcoming January 2018 <br /> event) that was in effect prior to initiating the Corrective Action Program), and, <br /> 4) Lifting or revocation of the currently-in-place "Cease and Desist" restriction on activities at <br /> the Hukill Gulch Millsite. <br /> Although we have attempted to provide a comprehensive photographic record within the <br /> Corrective Action Completion and Recertification Report (as Attachment II, thereof) of all phases <br /> of the Corrective Action Program from inception through completion, VRI anticipates that the <br /> Division will require a site inspection to observe the final "as-built' conditions associated with the <br /> recertified composite liner system (EPF) in order to issue "acceptance" of the re-certification. If <br /> so, please advise as to when it is convenient for you to do so (keeping in mind that winter is fast <br /> approaching and site access is difficult after a significant snowfall event), and we will <br /> accommodate same. <br /> Please be assured that: (a) final disposition of the containerized liquids will not be acted upon by <br /> VRI until such time concurrence and written authorization of the proposed method is received <br /> from the Division; (b) groundwater monitoring will continue to be carried out on a monthly basis <br /> until such time that the requested change to quarterly monitoring is authorized by the Division; <br /> and, (c) that VRI fully acknowledges that the current "Cease and Desist' status remains intact at <br /> this time. Accordingly, no activities beyond routine site monitoring and maintenance are being <br /> carried out at this time. <br /> If you have any questions or require further clarification of any aspect of the Completion Report <br /> and Recertification document, please feel free to contact me directly at (239) 537-1420. <br /> Regards, <br /> VENTURE RESOURCES, INC. <br /> Patrick D. Maher <br /> President <br /> cc: J. M. Beck, P.E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.