Laserfiche WebLink
W�za ' <br /> rCOLORADo LINING �����► I <br /> N T E R N A T 10 N A L o�, Daily Installation Report <br /> Date: Saturday,August 19,2017 <br /> Project: Idaho Springs Repair Job#6398 <br /> Owner: Patrick Maher <br /> Engineer: <br /> Contractor: Venture Resources Inc. <br /> Installation Supervisor: Randy Cosgrove <br /> Materials: 60 Mil HDT <br /> Pre-Weld Tests <br /> 7;20am 51 4807 400 N/A 126 183 N.S. 1763 P <br /> 121 181 P <br /> 122 184 P <br /> Repairs-7 <br /> V-Box Test All Pass! 73 Sun(W-10-20+ N/A <br /> Extrusion-267' <br /> Geo-Comp.-17,460 SF <br /> Comments: <br /> Left hotel @ 5:50, on site @ 6:50am. Loaded a roll of geo-composite& GCL Bar in truck @ top,and <br /> unload @ bottom.Strapped remaining 2 rolls vertically to forks.Trial Weld, Pass! Grind&Extrude R's 36- <br /> 42.Repairs Complete @ 10:30.Started V-Box Testing Repairs @ 8:30am. Done testing @ 1:30pm.All <br /> Pass!Started Geo-Composite deployment @ 10:45am. Finished Geo-Composite @ 5:45.Loaded all <br /> equipment.Explained to Patrick that our daily rate is based on an 8 hour day,he said he read it in the <br /> contract, he said he was fine with that.Job signed off,off site @ 6:15pm. Have to go back on Monday to <br /> pick up GCL bar. <br />